Triple

T22775826
Position Surface form Disambiguated ID Type / Status
Subject São Simão E563693 entity
Predicate borderedBy P224 FINISHED
Object Paranaíba River reservoir NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Paranaíba River reservoir | Statement: [São Simão, borderedBy, Paranaíba River reservoir]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Paranaíba River reservoir
Context triple: [São Simão, borderedBy, Paranaíba River reservoir]
  • A. Guarapiranga Reservoir
    Guarapiranga Reservoir is a large artificial lake in the southern part of São Paulo, Brazil, serving as an important source of water supply and a popular site for recreation and water sports.
  • B. Barra Bonita Reservoir
    Barra Bonita Reservoir is an artificial lake in the state of São Paulo, Brazil, created for hydroelectric power generation, navigation, and water regulation along the Tietê River.
  • C. Itaparica Dam
    Itaparica Dam is a large hydroelectric dam and reservoir complex on Brazil’s São Francisco River, primarily used for power generation and water regulation.
  • D. Sobradinho Dam
    Sobradinho Dam is a large hydroelectric and flood-control dam on Brazil’s São Francisco River, notable for creating one of the world’s largest artificial reservoirs.
  • E. Xingó Dam
    Xingó Dam is a large hydroelectric dam complex in northeastern Brazil that generates power and helps regulate the flow of the São Francisco River.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Paranaíba River reservoir
Target entity description: The Paranaíba River reservoir is a large artificial lake formed by damming the Paranaíba River, used primarily for hydroelectric power generation, water storage, and regional recreation in central Brazil.
  • A. Guarapiranga Reservoir
    Guarapiranga Reservoir is a large artificial lake in the southern part of São Paulo, Brazil, serving as an important source of water supply and a popular site for recreation and water sports.
  • B. Barra Bonita Reservoir
    Barra Bonita Reservoir is an artificial lake in the state of São Paulo, Brazil, created for hydroelectric power generation, navigation, and water regulation along the Tietê River.
  • C. Itaparica Dam
    Itaparica Dam is a large hydroelectric dam and reservoir complex on Brazil’s São Francisco River, primarily used for power generation and water regulation.
  • D. Sobradinho Dam
    Sobradinho Dam is a large hydroelectric and flood-control dam on Brazil’s São Francisco River, notable for creating one of the world’s largest artificial reservoirs.
  • E. Xingó Dam
    Xingó Dam is a large hydroelectric dam complex in northeastern Brazil that generates power and helps regulate the flow of the São Francisco River.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24554497c819080b996e071de27c2 completed April 17, 2026, 2:36 p.m.
NER Named-entity recognition batch_69f17b61acf881909d9f54e0966ee3cc completed April 29, 2026, 3:30 a.m.
Created at: April 17, 2026, 3:28 p.m.