Triple

T22771626
Position Surface form Disambiguated ID Type / Status
Subject Northeast Corridor at New Haven E563572 entity
Predicate instanceOf P0 FINISHED
Object rail infrastructure location C6436 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: rail infrastructure location
Context triple: [Northeast Corridor at New Haven, instanceOf, rail infrastructure location]
  • A. railway location chosen
    A railway location is a specific geographic point or area associated with railway infrastructure, such as stations, junctions, sidings, or signal sites, used for operational, logistical, and reference purposes within a rail network.
  • B. railway infrastructure element
    A railway infrastructure element is any physical component of a rail system—such as tracks, signals, switches, bridges, or platforms—that supports the safe and efficient operation of trains.
  • C. rail transportation infrastructure
    Rail transportation infrastructure encompasses the physical and organizational systems—such as tracks, stations, signaling, power supply, and related facilities—required to support the safe and efficient movement of trains and rail-based services.
  • D. railway network
    A railway network is an interconnected system of tracks, stations, signaling, and rolling stock that enables the organized movement of trains between multiple locations.
  • E. railway line
    A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24554497c819080b996e071de27c2 completed April 17, 2026, 2:36 p.m.
Created at: April 17, 2026, 3:27 p.m.