Triple

T22754796
Position Surface form Disambiguated ID Type / Status
Subject Bob Kane E562809 entity
Predicate coCreatorOf P806 FINISHED
Object Batman NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Batman | Statement: [Bob Kane, coCreatorOf, Batman]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Batman
Context triple: [Bob Kane, coCreatorOf, Batman]
  • A. Batman chosen
    Batman is a popular DC Comics superhero and cultural icon known for fighting crime in Gotham City using his intellect, detective skills, and advanced technology instead of superhuman powers.
  • B. Batman
    Batman is the stage name of Marques Houston, an American R&B singer, songwriter, and actor best known as a member of the group Immature/IMx and for his solo music career.
  • C. The Batman
    The Batman is an animated television series that reimagines DC Comics' Dark Knight in a stylized, modern Gotham as he battles a rogues' gallery of classic and newly interpreted villains.
  • D. The Batman
    The Batman is a 2022 neo-noir superhero film directed by Matt Reeves, starring Robert Pattinson as a young Bruce Wayne investigating a series of murders in a grim, crime-ridden Gotham City.
  • E. Batman Dam
    Batman Dam is a major rock-fill embankment dam in southeastern Turkey, built primarily for hydroelectric power generation and irrigation on the Batman River.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24551ec7881909a9c924dbea155f6 completed April 17, 2026, 2:36 p.m.
NER Named-entity recognition batch_69f179bc48788190b3deb9287d02cb2c completed April 29, 2026, 3:23 a.m.
Created at: April 17, 2026, 3:25 p.m.