Triple

T22754621
Position Surface form Disambiguated ID Type / Status
Subject Illinois Route 137 E562803 entity
Predicate namedPortion P5298 FINISHED
Object Amstutz Expressway (segment designation) NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Amstutz Expressway (segment designation) | Statement: [Illinois Route 137, namedPortion, Amstutz Expressway (segment designation)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Amstutz Expressway (segment designation)
Context triple: [Illinois Route 137, namedPortion, Amstutz Expressway (segment designation)]
  • A. Bruckner Expressway
    The Bruckner Expressway is a major highway in the Bronx, New York City, that carries Interstate 278 and connects several key routes in the borough.
  • B. Bruckner Expressway (I-278)
    The Bruckner Expressway (I-278) is a major elevated highway in the South Bronx that connects several interstate routes and serves as a key traffic corridor into and out of New York City.
  • C. O-1 motorway
    The O-1 motorway is a major urban highway in Istanbul that forms part of the city’s inner ring road system and crosses the Bosporus via the Bosporus Bridge, linking the European and Asian sides.
  • D. S7 expressway
    The S7 expressway is a major Polish north–south route connecting Gdańsk on the Baltic coast with Kraków and further southern regions, forming part of the European road network.
  • E. O-2 motorway
    The O-2 motorway is a major controlled-access highway in Istanbul that forms part of the city’s primary ring road system and carries heavy intercity and urban traffic across the metropolitan area.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Amstutz Expressway (segment designation)
Target entity description: The Amstutz Expressway is a short, limited-access highway segment in Waukegan, Illinois, known for its light traffic and frequent use as a filming location.
  • A. Bruckner Expressway
    The Bruckner Expressway is a major highway in the Bronx, New York City, that carries Interstate 278 and connects several key routes in the borough.
  • B. Bruckner Expressway (I-278)
    The Bruckner Expressway (I-278) is a major elevated highway in the South Bronx that connects several interstate routes and serves as a key traffic corridor into and out of New York City.
  • C. O-1 motorway
    The O-1 motorway is a major urban highway in Istanbul that forms part of the city’s inner ring road system and crosses the Bosporus via the Bosporus Bridge, linking the European and Asian sides.
  • D. S7 expressway
    The S7 expressway is a major Polish north–south route connecting Gdańsk on the Baltic coast with Kraków and further southern regions, forming part of the European road network.
  • E. O-2 motorway
    The O-2 motorway is a major controlled-access highway in Istanbul that forms part of the city’s primary ring road system and carries heavy intercity and urban traffic across the metropolitan area.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24551ec7881909a9c924dbea155f6 completed April 17, 2026, 2:36 p.m.
NER Named-entity recognition batch_69f179bc48788190b3deb9287d02cb2c completed April 29, 2026, 3:23 a.m.
Created at: April 17, 2026, 3:25 p.m.