Triple

T22747923
Position Surface form Disambiguated ID Type / Status
Subject Sual E562604 entity
Predicate hasPowerPlant P9904 FINISHED
Object Sual Power Station NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sual Power Station | Statement: [Sual, hasPowerPlant, Sual Power Station]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Sual Power Station
Context triple: [Sual, hasPowerPlant, Sual Power Station]
  • A. Sual Power Station chosen
    Sual Power Station is a large coal-fired power plant in the Philippines and one of the country’s major sources of electricity.
  • B. Olidan power station
    Olidan power station is one of Sweden’s oldest large-scale hydroelectric power plants, located in Trollhättan and historically important for the country’s industrial electrification.
  • C. Joun power station
    Joun power station is a hydroelectric power facility in Lebanon that harnesses the flow of the Litani River to generate electricity.
  • D. Polpitiya Power Station
    Polpitiya Power Station is a hydroelectric power plant in Sri Lanka that harnesses the flow of the Kelani River to generate electricity for the national grid.
  • E. Kiira Power Station
    Kiira Power Station is a major hydroelectric power plant on the Nile River in Uganda that significantly contributes to the country’s electricity generation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245513a5c81908d5cb471b4fc429d completed April 17, 2026, 2:36 p.m.
NER Named-entity recognition batch_69f179b702388190b134dde5f80ea3cd completed April 29, 2026, 3:23 a.m.
Created at: April 17, 2026, 3:24 p.m.