Triple
T22719204
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Richard F. Caris Mirror Lab |
E561814
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | mirror fabrication facility |
C46420
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: mirror fabrication facility Context triple: [Richard F. Caris Mirror Lab, instanceOf, mirror fabrication facility]
-
A.
optical instrument workshop
chosen
A specialized facility where optical instruments such as microscopes, telescopes, and lenses are designed, manufactured, assembled, calibrated, and repaired.
-
B.
glassworks
A glassworks is a facility where raw materials are melted, shaped, and finished into glass products such as bottles, windows, and decorative items.
-
C.
semiconductor manufacturing facility
A semiconductor manufacturing facility is a highly controlled industrial plant where raw silicon wafers are processed through complex, precise, and cleanroom-based fabrication steps to produce integrated circuits and microchips.
-
D.
foundry
A foundry is an industrial facility where metal is melted and cast into specific shapes using molds for manufacturing parts and products.
-
E.
steel finishing facility
A steel finishing facility is an industrial plant where semi-finished steel products undergo surface treatment, coating, cutting, and other final processing steps to meet specific quality, dimensional, and performance requirements.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2454fc984819088213b58ee87a002 |
completed | April 17, 2026, 2:35 p.m. |
Created at: April 17, 2026, 3:19 p.m.