Triple
T22717228
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Shear & Dodge |
E561766
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | mycologist team |
C16293
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: mycologist team Context triple: [Shear & Dodge, instanceOf, mycologist team]
-
A.
mycologist
chosen
A mycologist is a scientist who studies fungi, including their genetics, ecology, taxonomy, and potential uses or harms to humans and the environment.
-
B.
mycological classification
Mycological classification is the systematic organization and naming of fungi based on their morphological, genetic, ecological, and physiological characteristics to understand their relationships and diversity.
-
C.
collaborative group of botanists
A collaborative group of botanists is a team of plant scientists who work together to study, document, and manage plant life through shared research, fieldwork, and knowledge exchange.
-
D.
mushroom-like creature
A mushroom-like creature is a small, ambulatory being with a cap-and-stem body resembling a fungus, often dwelling in damp, shaded environments and exhibiting a blend of plant-like growth and animal-like behavior.
-
E.
sac fungus
A sac fungus is a member of the phylum Ascomycota, characterized by producing sexual spores in microscopic sac-like structures called asci.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2454fc984819088213b58ee87a002 |
completed | April 17, 2026, 2:35 p.m. |
Created at: April 17, 2026, 3:19 p.m.