Triple
T2270595
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bound Brook, New Jersey |
E50646
|
entity |
| Predicate | floodControlEfforts |
P7637
|
FINISHED |
| Object |
Green Brook Flood Control Project
The Green Brook Flood Control Project is a comprehensive flood mitigation initiative designed to protect Bound Brook and surrounding New Jersey communities from recurring flooding through levees, floodwalls, channel improvements, and related infrastructure.
|
E251725
|
NE FINISHED |
How this triple was built (5 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Green Brook Flood Control Project | Statement: [Bound Brook, New Jersey, floodControlEfforts, Green Brook Flood Control Project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Green Brook Flood Control Project Context triple: [Bound Brook, New Jersey, floodControlEfforts, Green Brook Flood Control Project]
-
A.
Schoharie–Esopus water diversion system
The Schoharie–Esopus water diversion system is a key component of New York City's upstate water supply infrastructure that transfers water from the Schoharie Reservoir into the Esopus Creek watershed via tunnels and related facilities.
-
B.
Don River and Central Waterfront Project
The Don River and Central Waterfront Project is a major urban revitalization and flood-protection initiative in Toronto focused on transforming the lower Don River and adjacent waterfront into a more resilient, accessible, and ecologically restored landscape.
-
C.
Delaware Aqueduct
The Delaware Aqueduct is a historic 19th-century suspension aqueduct that carried the Delaware and Hudson Canal over the Delaware River and is now preserved as the oldest surviving wire suspension bridge in the United States.
-
D.
Delaware Aqueduct
The Delaware Aqueduct is a major underground tunnel that transports drinking water from reservoirs in the Delaware River watershed to New York City, forming a critical component of the city’s water supply infrastructure.
-
E.
New Croton Dam
New Croton Dam is a large masonry gravity dam in New York that forms the New Croton Reservoir, a key component of New York City’s water supply system.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Green Brook Flood Control Project Triple: [Bound Brook, New Jersey, floodControlEfforts, Green Brook Flood Control Project]
Generated description
The Green Brook Flood Control Project is a comprehensive flood mitigation initiative designed to protect Bound Brook and surrounding New Jersey communities from recurring flooding through levees, floodwalls, channel improvements, and related infrastructure.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Green Brook Flood Control Project Target entity description: The Green Brook Flood Control Project is a comprehensive flood mitigation initiative designed to protect Bound Brook and surrounding New Jersey communities from recurring flooding through levees, floodwalls, channel improvements, and related infrastructure.
-
A.
Schoharie–Esopus water diversion system
The Schoharie–Esopus water diversion system is a key component of New York City's upstate water supply infrastructure that transfers water from the Schoharie Reservoir into the Esopus Creek watershed via tunnels and related facilities.
-
B.
Don River and Central Waterfront Project
The Don River and Central Waterfront Project is a major urban revitalization and flood-protection initiative in Toronto focused on transforming the lower Don River and adjacent waterfront into a more resilient, accessible, and ecologically restored landscape.
-
C.
Delaware Aqueduct
The Delaware Aqueduct is a historic 19th-century suspension aqueduct that carried the Delaware and Hudson Canal over the Delaware River and is now preserved as the oldest surviving wire suspension bridge in the United States.
-
D.
Delaware Aqueduct
The Delaware Aqueduct is a major underground tunnel that transports drinking water from reservoirs in the Delaware River watershed to New York City, forming a critical component of the city’s water supply infrastructure.
-
E.
New Croton Dam
New Croton Dam is a large masonry gravity dam in New York that forms the New Croton Reservoir, a key component of New York City’s water supply system.
- F. None of above. chosen
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: floodControlEfforts Context triple: [Bound Brook, New Jersey, floodControlEfforts, Green Brook Flood Control Project]
-
A.
hasFloodProtectionInfrastructure
Indicates that there exists built or implemented infrastructure designed to protect against or mitigate flooding for the referenced entity.
-
B.
floodCause
Indicates that one entity is the cause or source of a flood affecting another entity or area.
-
C.
hasFloodProtectionProject
chosen
Indicates that a flood protection project exists or is implemented for the referenced entity.
-
D.
hasFloodRisk
Indicates that an entity is exposed to a potential or expected risk of flooding under certain conditions.
-
E.
floodSeasonCause
Indicates the cause or contributing factor responsible for a particular flood season occurring.
- F. None of above.
Provenance (6 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88b05910c8190a9a2b1ff230c85f9 |
completed | March 4, 2026, 7:41 p.m. |
| NER | Named-entity recognition | batch_69abc39c6ff0819081a07696f1c29990 |
completed | March 7, 2026, 6:20 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ae71d97a108190a26ffd20fac91a7e |
completed | March 9, 2026, 7:08 a.m. |
| NEDg | Description generation | batch_69ae73a4bdd08190bb9fff64ffdbeed6 |
completed | March 9, 2026, 7:15 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69ae776fdfb48190ae8731002c537458 |
completed | March 9, 2026, 7:32 a.m. |
| PD | Predicate disambiguation | batch_69abbdb7719081909143efa8f48df4e4 |
completed | March 7, 2026, 5:55 a.m. |
Created at: March 4, 2026, 7:48 p.m.