Triple

T2270595
Position Surface form Disambiguated ID Type / Status
Subject Bound Brook, New Jersey E50646 entity
Predicate floodControlEfforts P7637 FINISHED
Object Green Brook Flood Control Project
The Green Brook Flood Control Project is a comprehensive flood mitigation initiative designed to protect Bound Brook and surrounding New Jersey communities from recurring flooding through levees, floodwalls, channel improvements, and related infrastructure.
E251725 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Green Brook Flood Control Project | Statement: [Bound Brook, New Jersey, floodControlEfforts, Green Brook Flood Control Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Green Brook Flood Control Project
Context triple: [Bound Brook, New Jersey, floodControlEfforts, Green Brook Flood Control Project]
  • A. Schoharie–Esopus water diversion system
    The Schoharie–Esopus water diversion system is a key component of New York City's upstate water supply infrastructure that transfers water from the Schoharie Reservoir into the Esopus Creek watershed via tunnels and related facilities.
  • B. Don River and Central Waterfront Project
    The Don River and Central Waterfront Project is a major urban revitalization and flood-protection initiative in Toronto focused on transforming the lower Don River and adjacent waterfront into a more resilient, accessible, and ecologically restored landscape.
  • C. Delaware Aqueduct
    The Delaware Aqueduct is a historic 19th-century suspension aqueduct that carried the Delaware and Hudson Canal over the Delaware River and is now preserved as the oldest surviving wire suspension bridge in the United States.
  • D. Delaware Aqueduct
    The Delaware Aqueduct is a major underground tunnel that transports drinking water from reservoirs in the Delaware River watershed to New York City, forming a critical component of the city’s water supply infrastructure.
  • E. New Croton Dam
    New Croton Dam is a large masonry gravity dam in New York that forms the New Croton Reservoir, a key component of New York City’s water supply system.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Green Brook Flood Control Project
Triple: [Bound Brook, New Jersey, floodControlEfforts, Green Brook Flood Control Project]
Generated description
The Green Brook Flood Control Project is a comprehensive flood mitigation initiative designed to protect Bound Brook and surrounding New Jersey communities from recurring flooding through levees, floodwalls, channel improvements, and related infrastructure.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Green Brook Flood Control Project
Target entity description: The Green Brook Flood Control Project is a comprehensive flood mitigation initiative designed to protect Bound Brook and surrounding New Jersey communities from recurring flooding through levees, floodwalls, channel improvements, and related infrastructure.
  • A. Schoharie–Esopus water diversion system
    The Schoharie–Esopus water diversion system is a key component of New York City's upstate water supply infrastructure that transfers water from the Schoharie Reservoir into the Esopus Creek watershed via tunnels and related facilities.
  • B. Don River and Central Waterfront Project
    The Don River and Central Waterfront Project is a major urban revitalization and flood-protection initiative in Toronto focused on transforming the lower Don River and adjacent waterfront into a more resilient, accessible, and ecologically restored landscape.
  • C. Delaware Aqueduct
    The Delaware Aqueduct is a historic 19th-century suspension aqueduct that carried the Delaware and Hudson Canal over the Delaware River and is now preserved as the oldest surviving wire suspension bridge in the United States.
  • D. Delaware Aqueduct
    The Delaware Aqueduct is a major underground tunnel that transports drinking water from reservoirs in the Delaware River watershed to New York City, forming a critical component of the city’s water supply infrastructure.
  • E. New Croton Dam
    New Croton Dam is a large masonry gravity dam in New York that forms the New Croton Reservoir, a key component of New York City’s water supply system.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: floodControlEfforts
Context triple: [Bound Brook, New Jersey, floodControlEfforts, Green Brook Flood Control Project]
  • A. hasFloodProtectionInfrastructure
    Indicates that there exists built or implemented infrastructure designed to protect against or mitigate flooding for the referenced entity.
  • B. floodCause
    Indicates that one entity is the cause or source of a flood affecting another entity or area.
  • C. hasFloodProtectionProject chosen
    Indicates that a flood protection project exists or is implemented for the referenced entity.
  • D. hasFloodRisk
    Indicates that an entity is exposed to a potential or expected risk of flooding under certain conditions.
  • E. floodSeasonCause
    Indicates the cause or contributing factor responsible for a particular flood season occurring.
  • F. None of above.

Provenance (6 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88b05910c8190a9a2b1ff230c85f9 completed March 4, 2026, 7:41 p.m.
NER Named-entity recognition batch_69abc39c6ff0819081a07696f1c29990 completed March 7, 2026, 6:20 a.m.
NED1 Entity disambiguation (via context triple) batch_69ae71d97a108190a26ffd20fac91a7e completed March 9, 2026, 7:08 a.m.
NEDg Description generation batch_69ae73a4bdd08190bb9fff64ffdbeed6 completed March 9, 2026, 7:15 a.m.
NED2 Entity disambiguation (via description) batch_69ae776fdfb48190ae8731002c537458 completed March 9, 2026, 7:32 a.m.
PD Predicate disambiguation batch_69abbdb7719081909143efa8f48df4e4 completed March 7, 2026, 5:55 a.m.
Created at: March 4, 2026, 7:48 p.m.