Triple
T22705119
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ministry of Development Planning of Bolivia |
E561429
|
entity |
| Predicate | locatedInTimeZone |
P109
|
FINISHED |
| Object | Bolivia Time |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bolivia Time | Statement: [Ministry of Development Planning of Bolivia, locatedInTimeZone, Bolivia Time]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Bolivia Time Context triple: [Ministry of Development Planning of Bolivia, locatedInTimeZone, Bolivia Time]
-
A.
Bolivia Time
chosen
Bolivia Time is the standard time zone used throughout Bolivia, corresponding to UTC−4 with no daylight saving time.
-
B.
Ecuador Time
Ecuador Time is the standard time zone used in mainland Ecuador, including cities such as Guayaquil, typically corresponding to UTC−05:00.
-
C.
Peru Time
Peru Time is the standard time zone used throughout Peru, corresponding to UTC−05:00 without daylight saving time.
-
D.
Paraguay Time (standard)
Paraguay Time (standard) is the time zone used in Paraguay during its non-daylight saving period, corresponding to UTC−04:00.
-
E.
Paraguay Summer Time
Paraguay Summer Time is the daylight saving time zone used in Paraguay, set one hour ahead of its standard time to align with neighboring regional schedules.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2454f1348819088d83f420925a5c1 |
completed | April 17, 2026, 2:35 p.m. |
| NER | Named-entity recognition | batch_69f178cdc93481908f85d04560f8c285 |
completed | April 29, 2026, 3:19 a.m. |
Created at: April 17, 2026, 3:16 p.m.