Triple

T22695703
Position Surface form Disambiguated ID Type / Status
Subject ILC Technical Design Report E561166 entity
Predicate instanceOf P0 FINISHED
Object International Linear Collider document C46710 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: International Linear Collider document
Context triple: [ILC Technical Design Report, instanceOf, International Linear Collider document]
  • A. linear particle accelerator
    A linear particle accelerator is a device that uses oscillating electric fields along a straight path to accelerate charged particles to high speeds for research, medical, or industrial applications.
  • B. hadron collider
    A hadron collider is a type of particle accelerator that propels hadrons, such as protons or heavy ions, to extremely high energies and smashes them together to study fundamental particles and forces.
  • C. particle accelerator upgrade project
    A particle accelerator upgrade project is a coordinated engineering and scientific effort to enhance an existing accelerator’s performance, capabilities, or reliability through targeted hardware, software, and infrastructure improvements.
  • D. radio-frequency linear accelerator
    A radio-frequency linear accelerator is a device that uses oscillating electromagnetic fields in a series of resonant cavities to accelerate charged particles along a straight path to high energies.
  • E. operational period of the Large Hadron Collider
    The operational period of the Large Hadron Collider is the span of time during which the accelerator is actively running experiments, colliding particles, and collecting data under defined technical and safety conditions.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2454e615481909c177440be559d2c completed April 17, 2026, 2:35 p.m.
Created at: April 17, 2026, 3:14 p.m.