Triple

T22695312
Position Surface form Disambiguated ID Type / Status
Subject Future Circular Collider E561158 entity
Predicate instanceOf P0 FINISHED
Object next-generation collider project C1693 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: next-generation collider project
Context triple: [Future Circular Collider, instanceOf, next-generation collider project]
  • A. particle accelerator upgrade project
    A particle accelerator upgrade project is a coordinated engineering and scientific effort to enhance an existing accelerator’s performance, capabilities, or reliability through targeted hardware, software, and infrastructure improvements.
  • B. hadron collider chosen
    A hadron collider is a type of particle accelerator that propels hadrons, such as protons or heavy ions, to extremely high energies and smashes them together to study fundamental particles and forces.
  • C. particle accelerator complex
    A particle accelerator complex is an integrated facility comprising accelerators, beamlines, detectors, and support infrastructure designed to accelerate charged particles to high energies for research, medical, or industrial applications.
  • D. CERN experiment
    A CERN experiment is a large-scale, collaborative scientific investigation conducted at CERN’s particle physics facilities to study fundamental particles and forces using high-energy collisions and advanced detectors.
  • E. Fermilab experiment
    A Fermilab experiment is a high-energy physics research project conducted at the Fermi National Accelerator Laboratory to investigate fundamental particles, forces, and the structure of matter using particle accelerators and detectors.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2454e615481909c177440be559d2c completed April 17, 2026, 2:35 p.m.
Created at: April 17, 2026, 3:14 p.m.