Triple

T22688399
Position Surface form Disambiguated ID Type / Status
Subject Mission Critical Push To Talk E560979 entity
Predicate integrationTarget P106650 FINISHED
Object land mobile radio systems (in many deployments) LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: land mobile radio systems (in many deployments) | Statement: [Mission Critical Push To Talk, integrationTarget, land mobile radio systems (in many deployments)]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: integrationTarget
Context triple: [Mission Critical Push To Talk, integrationTarget, land mobile radio systems (in many deployments)]
  • A. integrationGoal
    Indicates that one entity has the objective or intended outcome of being combined, unified, or made interoperable with another entity or system.
  • B. intendedTargets
    Indicates that an action, message, or object is specifically directed toward or meant to affect particular target entities.
  • C. integrationFeature chosen
    Indicates that one entity provides a capability or component specifically intended to enable or support integration with another system, service, or component.
  • D. backendTarget
    Indicates that one entity serves as the backend system, service, or endpoint that another entity connects to or depends on for processing or functionality.
  • E. integrationOutcome
    Indicates the result or consequence produced when two or more components, systems, or processes are combined or integrated.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2454d71b48190a1f80af9f82b6fcf completed April 17, 2026, 2:35 p.m.
NER Named-entity recognition batch_69f178983fc8819080aa00e45ff77952 completed April 29, 2026, 3:18 a.m.
PD Predicate disambiguation batch_69ee62b2259c819091ed1387a748b9f3 completed April 26, 2026, 7:08 p.m.
Created at: April 17, 2026, 3:13 p.m.