Triple

T22683750
Position Surface form Disambiguated ID Type / Status
Subject NORSOCOM E560852 entity
Predicate abbreviation P43 FINISHED
Object NORSOCOM NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: NORSOCOM | Statement: [NORSOCOM, abbreviation, NORSOCOM]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: NORSOCOM
Context triple: [NORSOCOM, abbreviation, NORSOCOM]
  • A. NORSOCOM chosen
    NORSOCOM is Norway’s unified special operations command responsible for overseeing and coordinating the country’s elite special forces units.
  • B. NORFORCE
    NORFORCE is a regional surveillance unit of the Australian Army Reserve, renowned for operating across vast and remote areas of northern Australia with a high proportion of Indigenous soldiers.
  • C. JORSOCOM
    JORSOCOM is the elite special operations command of the Jordanian Armed Forces, responsible for high-risk missions such as counterterrorism, reconnaissance, and unconventional warfare.
  • D. COMCO
    COMCO is the Swiss Competition Commission, the federal authority responsible for enforcing antitrust and competition law in Switzerland.
  • E. Scomi Engineering
    Scomi Engineering is a Malaysian engineering company known for designing and supplying monorail systems and related urban transport solutions.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2454d71b48190a1f80af9f82b6fcf completed April 17, 2026, 2:35 p.m.
NER Named-entity recognition batch_69f1786204d88190a837a5f04e16e94c completed April 29, 2026, 3:17 a.m.
Created at: April 17, 2026, 3:12 p.m.