Triple

T22650575
Position Surface form Disambiguated ID Type / Status
Subject React Router v5 E559080 entity
Predicate instanceOf P0 FINISHED
Object software library release C26543 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: software library release
Context triple: [React Router v5, instanceOf, software library release]
  • A. software release chosen
    A software release is a specific, packaged version of a software product that is formally delivered to users, typically including new features, fixes, and documentation.
  • B. software package
    A software package is a bundled collection of programs, libraries, configuration files, and metadata distributed together to provide specific functionality that can be easily installed, updated, and managed.
  • C. software release model
    A software release model is a conceptual framework that defines how, when, and in what form software versions are planned, built, tested, and delivered to users over time.
  • D. software
    Software is a collection of programs, data, and instructions that tell a computer or digital device how to perform specific tasks or functions.
  • E. software package repository
    A software package repository is a centralized storage and distribution system that hosts, organizes, and provides access to software packages and their metadata for installation, update, and dependency management.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245489dd88190b1f674acf61c8769 completed April 17, 2026, 2:35 p.m.
Created at: April 17, 2026, 3:05 p.m.