Triple
T22649752
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | react-native CLI |
E559061
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | React Native tooling |
C15486
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: React Native tooling Context triple: [react-native CLI, instanceOf, React Native tooling]
-
A.
cross-platform development framework
A cross-platform development framework is a software toolkit that enables developers to build applications that run on multiple operating systems or devices from a single shared codebase.
-
B.
front-end build tool
A front-end build tool is a software utility that automates tasks like bundling, transpiling, optimizing, and managing assets for client-side web applications.
-
C.
developer tool
chosen
A developer tool is a software application or utility designed to help programmers create, test, debug, and maintain code more efficiently.
-
D.
cross-platform UI framework
A cross-platform UI framework is a software toolkit that enables developers to build user interfaces once and deploy them across multiple operating systems and devices with minimal platform-specific changes.
-
E.
Xcode feature
A specific capability or tool within Apple's Xcode IDE that streamlines some aspect of developing, testing, or debugging applications for Apple platforms.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e245489dd88190b1f674acf61c8769 |
completed | April 17, 2026, 2:35 p.m. |
Created at: April 17, 2026, 3:05 p.m.