Triple

T22649559
Position Surface form Disambiguated ID Type / Status
Subject Expo Go E559057 entity
Predicate instanceOf P0 FINISHED
Object React Native development tool C15486 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: React Native development tool
Context triple: [Expo Go, instanceOf, React Native development tool]
  • A. cross-platform development framework
    A cross-platform development framework is a software toolkit that enables developers to build applications that run on multiple operating systems or devices from a single shared codebase.
  • B. developer tool chosen
    A developer tool is a software application or utility designed to help programmers create, test, debug, and maintain code more efficiently.
  • C. mobile app developer
    A mobile app developer is a software professional who designs, builds, tests, and maintains applications for mobile devices on platforms such as iOS and Android, optimizing for performance, usability, and platform-specific guidelines.
  • D. front-end build tool
    A front-end build tool is a software utility that automates tasks like bundling, transpiling, optimizing, and managing assets for client-side web applications.
  • E. cross-platform UI framework
    A cross-platform UI framework is a software toolkit that enables developers to build user interfaces once and deploy them across multiple operating systems and devices with minimal platform-specific changes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245489dd88190b1f674acf61c8769 completed April 17, 2026, 2:35 p.m.
Created at: April 17, 2026, 3:05 p.m.