Triple
T22646652
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kotmale Dam |
E558980
|
entity |
| Predicate | hasAlternativeName |
P39
|
FINISHED |
| Object | Kotmale Hydropower Project |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kotmale Hydropower Project | Statement: [Kotmale Dam, hasAlternativeName, Kotmale Hydropower Project]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Kotmale Hydropower Project Context triple: [Kotmale Dam, hasAlternativeName, Kotmale Hydropower Project]
-
A.
Shimsha Hydroelectric Project
Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
-
B.
Nachtigal Hydropower Project
The Nachtigal Hydropower Project is a major hydroelectric dam and power station in Cameroon designed to significantly boost the country’s electricity generation capacity.
-
C.
Idamalayar Hydroelectric Project
Idamalayar Hydroelectric Project is a major hydroelectric power station in Kerala, India, that harnesses the waters of the Periyar River to generate electricity.
-
D.
Arun III Hydroelectric Project
Arun III Hydroelectric Project is a major run-of-the-river hydropower plant under development in eastern Nepal, intended to generate electricity from the Arun River primarily for export to India and to support regional energy needs.
-
E.
Ujjani Hydroelectric Project
Ujjani Hydroelectric Project is a power-generating facility in Maharashtra, India, that harnesses the water stored by the Ujjani Dam to produce hydroelectric energy.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Kotmale Hydropower Project Target entity description: Kotmale Hydropower Project is a major hydroelectric power and water management scheme in Sri Lanka, centered on the Kotmale Dam and contributing significantly to the country’s electricity generation and irrigation.
-
A.
Shimsha Hydroelectric Project
Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
-
B.
Nachtigal Hydropower Project
The Nachtigal Hydropower Project is a major hydroelectric dam and power station in Cameroon designed to significantly boost the country’s electricity generation capacity.
-
C.
Idamalayar Hydroelectric Project
Idamalayar Hydroelectric Project is a major hydroelectric power station in Kerala, India, that harnesses the waters of the Periyar River to generate electricity.
-
D.
Arun III Hydroelectric Project
Arun III Hydroelectric Project is a major run-of-the-river hydropower plant under development in eastern Nepal, intended to generate electricity from the Arun River primarily for export to India and to support regional energy needs.
-
E.
Ujjani Hydroelectric Project
Ujjani Hydroelectric Project is a power-generating facility in Maharashtra, India, that harnesses the water stored by the Ujjani Dam to produce hydroelectric energy.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e24547f7fc819086e2c4ba3b979657 |
completed | April 17, 2026, 2:35 p.m. |
| NER | Named-entity recognition | batch_69f170382ba48190b77692762db43313 |
completed | April 29, 2026, 2:43 a.m. |
Created at: April 17, 2026, 3:05 p.m.