Triple

T22639851
Position Surface form Disambiguated ID Type / Status
Subject Clark County, Missouri E558791 entity
Predicate hasMajorHighway P385 FINISHED
Object Missouri Route 27 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Missouri Route 27 | Statement: [Clark County, Missouri, hasMajorHighway, Missouri Route 27]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Missouri Route 27
Context triple: [Clark County, Missouri, hasMajorHighway, Missouri Route 27]
  • A. Missouri Route 28
    Missouri Route 28 is a state highway in Missouri that runs through the central part of the state, connecting several rural communities and serving as a regional connector route.
  • B. Missouri Route 24
    Missouri Route 24 is a major east–west state highway in Missouri that connects numerous central and western communities, including Keytesville, and serves as an important regional transportation corridor.
  • C. Missouri Route 2
    Missouri Route 2 is a state highway in western Missouri that runs east–west, connecting rural communities and serving as a regional link to larger routes near the Kansas City metropolitan area.
  • D. Missouri Route 21
    Missouri Route 21 is a state highway in Missouri that runs generally north–south through the eastern part of the state, connecting the St. Louis area with communities to the south.
  • E. Missouri Route 22
    Missouri Route 22 is a state highway in central Missouri that serves as an important east–west route connecting several communities, including the city of Mexico.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Missouri Route 27
Target entity description: Missouri Route 27 is a short state highway in northeastern Missouri that connects U.S. Route 136 near Wayland to the Iowa state line, serving as a local north–south connector in Clark County.
  • A. Missouri Route 28
    Missouri Route 28 is a state highway in Missouri that runs through the central part of the state, connecting several rural communities and serving as a regional connector route.
  • B. Missouri Route 24
    Missouri Route 24 is a major east–west state highway in Missouri that connects numerous central and western communities, including Keytesville, and serves as an important regional transportation corridor.
  • C. Missouri Route 2
    Missouri Route 2 is a state highway in western Missouri that runs east–west, connecting rural communities and serving as a regional link to larger routes near the Kansas City metropolitan area.
  • D. Missouri Route 21
    Missouri Route 21 is a state highway in Missouri that runs generally north–south through the eastern part of the state, connecting the St. Louis area with communities to the south.
  • E. Missouri Route 22
    Missouri Route 22 is a state highway in central Missouri that serves as an important east–west route connecting several communities, including the city of Mexico.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24547f7fc819086e2c4ba3b979657 completed April 17, 2026, 2:35 p.m.
NER Named-entity recognition batch_69f17010aa4c8190a9f0cf7eb4c066cd completed April 29, 2026, 2:42 a.m.
Created at: April 17, 2026, 3:04 p.m.