Triple
T22639569
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | A9 motorway (Portugal) |
E558782
|
entity |
| Predicate | officialName |
P66
|
FINISHED |
| Object | Circular Regional Exterior de Lisboa |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Circular Regional Exterior de Lisboa | Statement: [A9 motorway (Portugal), officialName, Circular Regional Exterior de Lisboa]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Circular Regional Exterior de Lisboa Context triple: [A9 motorway (Portugal), officialName, Circular Regional Exterior de Lisboa]
-
A.
Circular Regional Exterior do Porto
Circular Regional Exterior do Porto is a Portuguese motorway forming an outer ring road around the Porto metropolitan area, helping to divert traffic away from the city center.
-
B.
Avenidas Novas area of Lisbon
The Avenidas Novas area of Lisbon is a central, modern district characterized by wide avenues, business and shopping zones, and a mix of residential and commercial buildings.
-
C.
Lisboa-Oriente
Lisboa-Oriente is a major intermodal railway and transport hub in Lisbon, Portugal, known for its modern architecture and role as a key gateway for national and international travel.
-
D.
Lisbon streets
Lisbon streets are the atmospheric urban backdrop of Portugal’s capital, known for their steep hills, cobblestone pavements, and historic trams winding through colorful, timeworn neighborhoods.
-
E.
Porto ring road system
The Porto ring road system is a network of motorways encircling the city of Porto, designed to divert through-traffic from the urban core and improve regional connectivity.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Circular Regional Exterior de Lisboa Target entity description: Circular Regional Exterior de Lisboa is a major Portuguese motorway forming an outer ring road around the Lisbon metropolitan area, facilitating regional and transit traffic.
-
A.
Circular Regional Exterior do Porto
Circular Regional Exterior do Porto is a Portuguese motorway forming an outer ring road around the Porto metropolitan area, helping to divert traffic away from the city center.
-
B.
Avenidas Novas area of Lisbon
The Avenidas Novas area of Lisbon is a central, modern district characterized by wide avenues, business and shopping zones, and a mix of residential and commercial buildings.
-
C.
Lisboa-Oriente
Lisboa-Oriente is a major intermodal railway and transport hub in Lisbon, Portugal, known for its modern architecture and role as a key gateway for national and international travel.
-
D.
Lisbon streets
Lisbon streets are the atmospheric urban backdrop of Portugal’s capital, known for their steep hills, cobblestone pavements, and historic trams winding through colorful, timeworn neighborhoods.
-
E.
Porto ring road system
The Porto ring road system is a network of motorways encircling the city of Porto, designed to divert through-traffic from the urban core and improve regional connectivity.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e24547f7fc819086e2c4ba3b979657 |
completed | April 17, 2026, 2:35 p.m. |
| NER | Named-entity recognition | batch_69f17010aa4c8190a9f0cf7eb4c066cd |
completed | April 29, 2026, 2:42 a.m. |
Created at: April 17, 2026, 3:04 p.m.