Triple

T22639522
Position Surface form Disambiguated ID Type / Status
Subject A12 motorway (Portugal) E558781 entity
Predicate isPartOfCorridor P35 FINISHED
Object Lisbon–Setúbal transport corridor NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lisbon–Setúbal transport corridor | Statement: [A12 motorway (Portugal), isPartOfCorridor, Lisbon–Setúbal transport corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Lisbon–Setúbal transport corridor
Context triple: [A12 motorway (Portugal), isPartOfCorridor, Lisbon–Setúbal transport corridor]
  • A. Lisbon–Ericeira corridor
    The Lisbon–Ericeira corridor is a key transport axis in western Portugal linking the Lisbon metropolitan area with the coastal town of Ericeira and surrounding communities.
  • B. Lisbon–Braga route
    The Lisbon–Braga route is a major intercity rail corridor in Portugal linking the capital Lisbon with the northern city of Braga.
  • C. Aveiro–Vilar Formoso international corridor
    The Aveiro–Vilar Formoso international corridor is a major Portuguese transport axis linking the Atlantic port city of Aveiro to the Spanish border at Vilar Formoso, facilitating international trade and transit between Portugal and central Europe.
  • D. Linha de Setúbal
    Linha de Setúbal is a Portuguese railway line serving the Setúbal region, connecting it to the national rail network.
  • E. Lisbon–Porto main line
    The Lisbon–Porto main line is Portugal’s principal railway corridor, connecting the capital Lisbon with the northern city of Porto and serving major intermediate urban centers.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Lisbon–Setúbal transport corridor
Target entity description: The Lisbon–Setúbal transport corridor is a major Portuguese transit axis linking the capital Lisbon with the industrial and port city of Setúbal through an integrated network of road and other transport routes.
  • A. Lisbon–Ericeira corridor
    The Lisbon–Ericeira corridor is a key transport axis in western Portugal linking the Lisbon metropolitan area with the coastal town of Ericeira and surrounding communities.
  • B. Lisbon–Braga route
    The Lisbon–Braga route is a major intercity rail corridor in Portugal linking the capital Lisbon with the northern city of Braga.
  • C. Aveiro–Vilar Formoso international corridor
    The Aveiro–Vilar Formoso international corridor is a major Portuguese transport axis linking the Atlantic port city of Aveiro to the Spanish border at Vilar Formoso, facilitating international trade and transit between Portugal and central Europe.
  • D. Linha de Setúbal chosen
    Linha de Setúbal is a Portuguese railway line serving the Setúbal region, connecting it to the national rail network.
  • E. Lisbon–Porto main line
    The Lisbon–Porto main line is Portugal’s principal railway corridor, connecting the capital Lisbon with the northern city of Porto and serving major intermediate urban centers.
  • F. None of above.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24547f7fc819086e2c4ba3b979657 completed April 17, 2026, 2:35 p.m.
NER Named-entity recognition batch_69f17010aa4c8190a9f0cf7eb4c066cd completed April 29, 2026, 2:42 a.m.
Created at: April 17, 2026, 3:04 p.m.