Triple
T22639522
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | A12 motorway (Portugal) |
E558781
|
entity |
| Predicate | isPartOfCorridor |
P35
|
FINISHED |
| Object | Lisbon–Setúbal transport corridor |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lisbon–Setúbal transport corridor | Statement: [A12 motorway (Portugal), isPartOfCorridor, Lisbon–Setúbal transport corridor]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Lisbon–Setúbal transport corridor Context triple: [A12 motorway (Portugal), isPartOfCorridor, Lisbon–Setúbal transport corridor]
-
A.
Lisbon–Ericeira corridor
The Lisbon–Ericeira corridor is a key transport axis in western Portugal linking the Lisbon metropolitan area with the coastal town of Ericeira and surrounding communities.
-
B.
Lisbon–Braga route
The Lisbon–Braga route is a major intercity rail corridor in Portugal linking the capital Lisbon with the northern city of Braga.
-
C.
Aveiro–Vilar Formoso international corridor
The Aveiro–Vilar Formoso international corridor is a major Portuguese transport axis linking the Atlantic port city of Aveiro to the Spanish border at Vilar Formoso, facilitating international trade and transit between Portugal and central Europe.
-
D.
Linha de Setúbal
Linha de Setúbal is a Portuguese railway line serving the Setúbal region, connecting it to the national rail network.
-
E.
Lisbon–Porto main line
The Lisbon–Porto main line is Portugal’s principal railway corridor, connecting the capital Lisbon with the northern city of Porto and serving major intermediate urban centers.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Lisbon–Setúbal transport corridor Target entity description: The Lisbon–Setúbal transport corridor is a major Portuguese transit axis linking the capital Lisbon with the industrial and port city of Setúbal through an integrated network of road and other transport routes.
-
A.
Lisbon–Ericeira corridor
The Lisbon–Ericeira corridor is a key transport axis in western Portugal linking the Lisbon metropolitan area with the coastal town of Ericeira and surrounding communities.
-
B.
Lisbon–Braga route
The Lisbon–Braga route is a major intercity rail corridor in Portugal linking the capital Lisbon with the northern city of Braga.
-
C.
Aveiro–Vilar Formoso international corridor
The Aveiro–Vilar Formoso international corridor is a major Portuguese transport axis linking the Atlantic port city of Aveiro to the Spanish border at Vilar Formoso, facilitating international trade and transit between Portugal and central Europe.
-
D.
Linha de Setúbal
chosen
Linha de Setúbal is a Portuguese railway line serving the Setúbal region, connecting it to the national rail network.
-
E.
Lisbon–Porto main line
The Lisbon–Porto main line is Portugal’s principal railway corridor, connecting the capital Lisbon with the northern city of Porto and serving major intermediate urban centers.
- F. None of above.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e24547f7fc819086e2c4ba3b979657 |
completed | April 17, 2026, 2:35 p.m. |
| NER | Named-entity recognition | batch_69f17010aa4c8190a9f0cf7eb4c066cd |
completed | April 29, 2026, 2:42 a.m. |
Created at: April 17, 2026, 3:04 p.m.