Triple

T22627480
Position Surface form Disambiguated ID Type / Status
Subject Ningbo Tengtou Pavilion at the Venice Biennale E558460 entity
Predicate usesBuildingTechniquesFrom P3047 FINISHED
Object traditional Chinese architecture LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: traditional Chinese architecture | Statement: [Ningbo Tengtou Pavilion at the Venice Biennale, usesBuildingTechniquesFrom, traditional Chinese architecture]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: usesBuildingTechniquesFrom
Context triple: [Ningbo Tengtou Pavilion at the Venice Biennale, usesBuildingTechniquesFrom, traditional Chinese architecture]
  • A. constructionTechniqueComparedTo
    Indicates a relationship where one construction technique is evaluated or contrasted against another in terms of method, quality, efficiency, or other relevant criteria.
  • B. usedByTechnique
    Indicates that a particular technique makes use of or employs the referenced entity as part of its method or process.
  • C. usedOnBuildingOf
    Indicates that something is applied to, installed on, or otherwise utilized on the structure of a particular building.
  • D. hasTechnique chosen
    Indicates that an entity employs, utilizes, or is associated with a particular method, procedure, or technique.
  • E. constructionUsed
    Indicates that one entity was employed as a construction method, material, or component in creating or assembling another entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245467d9881908d6985bd0db7a1f1 completed April 17, 2026, 2:35 p.m.
NER Named-entity recognition batch_69f16e3e09ec8190af940c25c7e8e029 completed April 29, 2026, 2:34 a.m.
PD Predicate disambiguation batch_69ee62855558819080da946c7b35a160 completed April 26, 2026, 7:07 p.m.
Created at: April 17, 2026, 3:02 p.m.