Triple

T22622940
Position Surface form Disambiguated ID Type / Status
Subject Lazi Convent E558331 entity
Predicate locatedNear P294 FINISHED
Object Siquijor Circumferential Road NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Siquijor Circumferential Road | Statement: [Lazi Convent, locatedNear, Siquijor Circumferential Road]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Siquijor Circumferential Road
Context triple: [Lazi Convent, locatedNear, Siquijor Circumferential Road]
  • A. Maharlika Highway
    Maharlika Highway is a major national road network in the Philippines that forms part of the country’s primary north–south transportation backbone across Luzon, Samar, Leyte, and Mindanao.
  • B. D'Aguilar Highway
    D'Aguilar Highway is a major rural highway in Queensland, Australia, linking inland towns with coastal and metropolitan areas northwest of Brisbane.
  • C. Tagaytay–Nasugbu Road
    Tagaytay–Nasugbu Road is a major highway in the Philippines that links the city of Tagaytay in Cavite to the coastal town of Nasugbu in Batangas, serving as a key route for tourism and local travel.
  • D. Manuel L. Quezon National Highway
    Manuel L. Quezon National Highway is a major arterial road in Cebu that forms a key segment of the Cebu–Mactan transport corridor, linking important urban and commercial areas.
  • E. Francisco Fajardo Highway
    The Francisco Fajardo Highway is a major urban expressway running through Caracas, Venezuela, serving as one of the city's primary east–west transportation arteries.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Siquijor Circumferential Road
Target entity description: The Siquijor Circumferential Road is the main coastal highway that loops around the island of Siquijor in the Philippines, connecting its towns, beaches, and tourist attractions.
  • A. Maharlika Highway
    Maharlika Highway is a major national road network in the Philippines that forms part of the country’s primary north–south transportation backbone across Luzon, Samar, Leyte, and Mindanao.
  • B. D'Aguilar Highway
    D'Aguilar Highway is a major rural highway in Queensland, Australia, linking inland towns with coastal and metropolitan areas northwest of Brisbane.
  • C. Tagaytay–Nasugbu Road
    Tagaytay–Nasugbu Road is a major highway in the Philippines that links the city of Tagaytay in Cavite to the coastal town of Nasugbu in Batangas, serving as a key route for tourism and local travel.
  • D. Manuel L. Quezon National Highway
    Manuel L. Quezon National Highway is a major arterial road in Cebu that forms a key segment of the Cebu–Mactan transport corridor, linking important urban and commercial areas.
  • E. Francisco Fajardo Highway
    The Francisco Fajardo Highway is a major urban expressway running through Caracas, Venezuela, serving as one of the city's primary east–west transportation arteries.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24545a8e08190bfa7482a2c725ff1 completed April 17, 2026, 2:35 p.m.
NER Named-entity recognition batch_69f16e3ad6f48190b351a52e4b1d9b2d completed April 29, 2026, 2:34 a.m.
Created at: April 17, 2026, 3:01 p.m.