Triple

T22619339
Position Surface form Disambiguated ID Type / Status
Subject Ruta Nacional 3 E558230 entity
Predicate hasJunctionWith P1018 FINISHED
Object Ruta Nacional 25 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ruta Nacional 25 | Statement: [Ruta Nacional 3, hasJunctionWith, Ruta Nacional 25]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ruta Nacional 25
Context triple: [Ruta Nacional 3, hasJunctionWith, Ruta Nacional 25]
  • A. Ruta Nacional 5
    Ruta Nacional 5 is a major Argentine highway that connects Buenos Aires with the interior of the Buenos Aires and La Pampa provinces, serving as an important transportation corridor in central Argentina.
  • B. Ruta Nacional 251
    Ruta Nacional 251 is an Argentine national highway in Patagonia that connects inland areas of Río Negro Province with the coastal city of San Antonio Oeste and links to major routes such as Ruta Nacional 3.
  • C. Ruta Nacional 22
    Ruta Nacional 22 is a major Argentine highway that runs across the provinces of Buenos Aires, La Pampa, Río Negro, and Neuquén, serving as an important east–west transportation corridor in northern Patagonia.
  • D. Ruta Nacional 12
    Ruta Nacional 12 is a major Argentine highway that runs through the northeastern provinces, connecting Buenos Aires with the Mesopotamia region and the border with Paraguay and Brazil.
  • E. Ruta Nacional 38
    Ruta Nacional 38 is a major Argentine highway that runs through several provinces in the northwest, serving as an important corridor for regional connectivity and commerce.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Ruta Nacional 25
Target entity description: Ruta Nacional 25 is an Argentine national highway that runs across the Chubut Province, connecting the Patagonian coast with the Andean region.
  • A. Ruta Nacional 5
    Ruta Nacional 5 is a major Argentine highway that connects Buenos Aires with the interior of the Buenos Aires and La Pampa provinces, serving as an important transportation corridor in central Argentina.
  • B. Ruta Nacional 251
    Ruta Nacional 251 is an Argentine national highway in Patagonia that connects inland areas of Río Negro Province with the coastal city of San Antonio Oeste and links to major routes such as Ruta Nacional 3.
  • C. Ruta Nacional 22
    Ruta Nacional 22 is a major Argentine highway that runs across the provinces of Buenos Aires, La Pampa, Río Negro, and Neuquén, serving as an important east–west transportation corridor in northern Patagonia.
  • D. Ruta Nacional 12
    Ruta Nacional 12 is a major Argentine highway that runs through the northeastern provinces, connecting Buenos Aires with the Mesopotamia region and the border with Paraguay and Brazil.
  • E. Ruta Nacional 38
    Ruta Nacional 38 is a major Argentine highway that runs through several provinces in the northwest, serving as an important corridor for regional connectivity and commerce.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24545a8e08190bfa7482a2c725ff1 completed April 17, 2026, 2:35 p.m.
NER Named-entity recognition batch_69f16e377ae88190832edfdfbc3ed58f completed April 29, 2026, 2:34 a.m.
Created at: April 17, 2026, 3 p.m.