Triple

T22618104
Position Surface form Disambiguated ID Type / Status
Subject Akosombo E558199 entity
Predicate electricGridConnection P25653 FINISHED
Object connected to Ghana national grid via Akosombo Dam LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: connected to Ghana national grid via Akosombo Dam | Statement: [Akosombo, electricGridConnection, connected to Ghana national grid via Akosombo Dam]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: electricGridConnection
Context triple: [Akosombo, electricGridConnection, connected to Ghana national grid via Akosombo Dam]
  • A. gridInterconnection
    Indicates a connection or linkage between electrical grids that allows power exchange or coordinated operation.
  • B. hasGridConnection chosen
    Indicates that an entity is connected to an electrical grid, enabling it to receive or supply grid-based power.
  • C. gridConnectionAgreementWith
    Indicates an agreement establishing the terms and conditions under which one party is connected to another party’s electrical grid.
  • D. electrificationServedBy
    Indicates that the electrification of a system, area, or infrastructure is provided, supported, or enabled by a specified source, service, or entity.
  • E. gridConnectionPurpose
    Indicates the intended role or function of a connection to an electrical grid within a system or network.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24545a8e08190bfa7482a2c725ff1 completed April 17, 2026, 2:35 p.m.
NER Named-entity recognition batch_69f167ef7a148190870334af9c8b79a4 completed April 29, 2026, 2:07 a.m.
PD Predicate disambiguation batch_69ee62855558819080da946c7b35a160 completed April 26, 2026, 7:07 p.m.
Created at: April 17, 2026, 2:59 p.m.