Triple
T22616643
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Avrasya Tüneli İşletme İnşaat ve Yatırım A.Ş. |
E558164
|
entity |
| Predicate | operates |
P24
|
FINISHED |
| Object | Eurasia Tunnel road project in Istanbul |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Eurasia Tunnel road project in Istanbul | Statement: [Avrasya Tüneli İşletme İnşaat ve Yatırım A.Ş., operates, Eurasia Tunnel road project in Istanbul]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Eurasia Tunnel road project in Istanbul Context triple: [Avrasya Tüneli İşletme İnşaat ve Yatırım A.Ş., operates, Eurasia Tunnel road project in Istanbul]
-
A.
Ankara–İstanbul high-speed railway
The Ankara–İstanbul high-speed railway is a major Turkish high-speed rail corridor linking the capital Ankara with the country’s largest city, Istanbul, significantly reducing travel times between the two.
-
B.
Istanbul–Ankara railway
The Istanbul–Ankara railway is a major rail corridor in Turkey that connects the country’s largest city, Istanbul, with its capital, Ankara, serving as a key route for both passenger and freight transport.
-
C.
Marmaray rail tunnel
The Marmaray rail tunnel is an undersea railway tunnel in Istanbul that connects the European and Asian sides of the city beneath the Bosporus Strait.
-
D.
Ankara–İzmir transport corridor
The Ankara–İzmir transport corridor is a major intercity route in Turkey linking the capital Ankara with the Aegean city of İzmir and passing through several central provinces.
-
E.
Istanbul commuter rail network
The Istanbul commuter rail network is a suburban rail system serving the greater Istanbul metropolitan area, integrating cross-Bosporus links and multiple lines to connect key residential and commercial districts.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Eurasia Tunnel road project in Istanbul Target entity description: The Eurasia Tunnel road project in Istanbul is an undersea road tunnel beneath the Bosphorus that provides a direct roadway connection between the European and Asian sides of the city to reduce traffic congestion and travel time.
-
A.
Ankara–İstanbul high-speed railway
The Ankara–İstanbul high-speed railway is a major Turkish high-speed rail corridor linking the capital Ankara with the country’s largest city, Istanbul, significantly reducing travel times between the two.
-
B.
Istanbul–Ankara railway
The Istanbul–Ankara railway is a major rail corridor in Turkey that connects the country’s largest city, Istanbul, with its capital, Ankara, serving as a key route for both passenger and freight transport.
-
C.
Marmaray rail tunnel
The Marmaray rail tunnel is an undersea railway tunnel in Istanbul that connects the European and Asian sides of the city beneath the Bosporus Strait.
-
D.
Ankara–İzmir transport corridor
The Ankara–İzmir transport corridor is a major intercity route in Turkey linking the capital Ankara with the Aegean city of İzmir and passing through several central provinces.
-
E.
Istanbul commuter rail network
The Istanbul commuter rail network is a suburban rail system serving the greater Istanbul metropolitan area, integrating cross-Bosporus links and multiple lines to connect key residential and commercial districts.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e24545a8e08190bfa7482a2c725ff1 |
completed | April 17, 2026, 2:35 p.m. |
| NER | Named-entity recognition | batch_69f167eeb220819082c90a8bd3cadc4c |
completed | April 29, 2026, 2:07 a.m. |
Created at: April 17, 2026, 2:59 p.m.