Triple

T22612213
Position Surface form Disambiguated ID Type / Status
Subject Grose River E566736 entity
Predicate partOf P40 FINISHED
Object Hawkesbury–Nepean catchment NE NERFINISHED

Disambiguation candidates (1 decision)

The exact options the model was shown at each disambiguation step, with the option it chose highlighted — the evidence behind this triple's disambiguated ids.

NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Hawkesbury–Nepean catchment
Context triple: [Grose River, partOf, Hawkesbury–Nepean catchment]
  • A. Hawkesbury–Nepean catchment chosen
    The Hawkesbury–Nepean catchment is a major river system and drainage basin in New South Wales, Australia, encompassing extensive urban, agricultural, and natural areas west and north of Sydney.
  • B. Parramatta River catchment
    The Parramatta River catchment is the drainage basin in Sydney, Australia, that collects rainfall and runoff feeding into the Parramatta River and its surrounding waterways and suburbs.
  • C. Murrumbidgee catchment
    The Murrumbidgee catchment is the river basin and drainage area that collects and channels water into the Murrumbidgee River within the Murray–Darling Basin in southeastern Australia.
  • D. Hawkesbury River
    The Hawkesbury River is a major waterway in New South Wales, Australia, known for its scenic estuary, rich Aboriginal heritage, and role as a key natural boundary northwest of Sydney.
  • E. Macquarie–Castlereagh catchment
    The Macquarie–Castlereagh catchment is a major river basin in central-west New South Wales, Australia, encompassing the Macquarie and Castlereagh river systems and their associated wetlands and water storages.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

Stage Batch ID Job type Status
creating batch_69e245884860819081046ce07d5872c4 elicitation completed
NER batch_69f167eb08c88190bf2380fa8575d2da ner completed
Created at: April 17, 2026, 2:57 p.m.