Triple
T22610026
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Paria River area |
E566674
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | canyon area |
C46572
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: canyon area Context triple: [Paria River area, instanceOf, canyon area]
-
A.
canyon complex
A canyon complex is an interconnected system of deep, narrow valleys and gorges, often with branching side canyons and varied geological formations, created primarily by long-term erosion.
-
B.
canyon park
A canyon park is a protected natural area centered around a canyon landscape, offering recreational opportunities such as hiking, sightseeing, and wildlife observation amid dramatic geological formations.
-
C.
rim of canyon
The rim of a canyon is the elevated edge or boundary where the relatively flat surrounding terrain abruptly transitions into the steep walls descending into the canyon below.
-
D.
sub-canyon
A sub-canyon is a smaller, subsidiary canyon that branches off from or lies within a larger canyon system, typically formed by localized erosion processes.
-
E.
badlands region
A badlands region is a harsh, heavily eroded landscape of steep slopes, sparse vegetation, and intricate gullies formed by rapid weathering and water erosion of soft sedimentary rocks.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e245884860819081046ce07d5872c4 |
completed | April 17, 2026, 2:36 p.m. |
Created at: April 17, 2026, 2:56 p.m.