Triple

T22609466
Position Surface form Disambiguated ID Type / Status
Subject Alstom Washwood Heath E566660 entity
Predicate instanceOf P0 FINISHED
Object railway manufacturing facility C8286 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway manufacturing facility
Context triple: [Alstom Washwood Heath, instanceOf, railway manufacturing facility]
  • A. railroad facility
    A railroad facility is a dedicated site or complex that supports the operation, maintenance, management, or interchange of trains and rail infrastructure.
  • B. locomotive works chosen
    A locomotive works is an industrial facility where locomotives are designed, manufactured, assembled, repaired, and maintained.
  • C. rail transport manufacturer
    A rail transport manufacturer is a company that designs, engineers, and produces railway vehicles and related equipment such as locomotives, passenger cars, freight wagons, and signaling systems.
  • D. former railway facility
    A former railway facility is a decommissioned or repurposed site that once served operational functions for rail transport, such as stations, depots, yards, or maintenance buildings.
  • E. industrial railway
    An industrial railway is a specialized rail system used within or between industrial facilities to transport raw materials, goods, and equipment efficiently as part of production and logistics operations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e245884860819081046ce07d5872c4 completed April 17, 2026, 2:36 p.m.
Created at: April 17, 2026, 2:56 p.m.