Triple

T2256409
Position Surface form Disambiguated ID Type / Status
Subject Vails Grove E49735 entity
Predicate locatedNear P294 FINISHED
Object Bog Brook Reservoir E16423 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bog Brook Reservoir | Statement: [Vails Grove, locatedNear, Bog Brook Reservoir]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Bog Brook Reservoir
Context triple: [Vails Grove, locatedNear, Bog Brook Reservoir]
  • A. Bog Brook Reservoir chosen
    Bog Brook Reservoir is a small New York City water supply reservoir in southeastern New York State that forms part of the Croton Watershed system.
  • B. Fells Reservoir
    Fells Reservoir is a man-made water body in Massachusetts that serves as part of the regional water supply and recreational landscape within the Middlesex Fells Reservation.
  • C. Harperrig Reservoir
    Harperrig Reservoir is a man-made freshwater reservoir in the Pentland Hills of Scotland, used for water supply, fishing, and recreation.
  • D. Boyds Corner Reservoir
    Boyds Corner Reservoir is a small New York City water supply reservoir in Putnam County, New York, that forms part of the city’s Croton watershed system.
  • E. Smallwood Reservoir
    Smallwood Reservoir is a vast man-made lake in Labrador, Canada, created for hydroelectric power generation as part of the Churchill River system.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88aaa9250819095e127d0d77e8a32 completed March 4, 2026, 7:40 p.m.
NER Named-entity recognition batch_69abc1570dc88190bb2b17ed4c25dbb5 completed March 7, 2026, 6:10 a.m.
NED1 Entity disambiguation (via context triple) batch_69ae96021324819088eafcaf06f97455 completed March 9, 2026, 9:42 a.m.
Created at: March 4, 2026, 7:47 p.m.