Triple
T22540012
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ogba |
E557261
|
entity |
| Predicate | transportConnection |
P1298
|
FINISHED |
| Object | Ogba–Ikeja road network |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ogba–Ikeja road network | Statement: [Ogba, transportConnection, Ogba–Ikeja road network]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Ogba–Ikeja road network Context triple: [Ogba, transportConnection, Ogba–Ikeja road network]
-
A.
Oworonshoki–Oshodi Expressway
The Oworonshoki–Oshodi Expressway is a major highway in Lagos, Nigeria, that connects the Oshodi transport hub to the Oworonshoki area and links key routes into Lagos Island and the mainland.
-
B.
Ring Road, Ibadan
Ring Road, Ibadan is a major commercial and transportation hub in Ibadan, Nigeria, known for its busy traffic, businesses, and central role in the city’s urban layout.
-
C.
Jos–Abuja road
The Jos–Abuja road is a major highway in central Nigeria that connects the city of Jos with the nation’s capital, Abuja, passing through scenic highland areas and notable natural attractions.
-
D.
Nnamdi Azikiwe Expressway, Abuja
Nnamdi Azikiwe Expressway, Abuja is a major arterial highway in Nigeria’s capital city, running near key landmarks such as Aso Hill and connecting important districts across Abuja.
-
E.
Osogbo–Okuku road corridor
The Osogbo–Okuku road corridor is a major transportation route in Osun State, Nigeria, linking key towns and facilitating regional movement and commerce.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Ogba–Ikeja road network Target entity description: The Ogba–Ikeja road network is a key urban roadway system in Lagos, Nigeria, linking the Ogba area with the major commercial and administrative hub of Ikeja.
-
A.
Oworonshoki–Oshodi Expressway
The Oworonshoki–Oshodi Expressway is a major highway in Lagos, Nigeria, that connects the Oshodi transport hub to the Oworonshoki area and links key routes into Lagos Island and the mainland.
-
B.
Ring Road, Ibadan
Ring Road, Ibadan is a major commercial and transportation hub in Ibadan, Nigeria, known for its busy traffic, businesses, and central role in the city’s urban layout.
-
C.
Jos–Abuja road
The Jos–Abuja road is a major highway in central Nigeria that connects the city of Jos with the nation’s capital, Abuja, passing through scenic highland areas and notable natural attractions.
-
D.
Nnamdi Azikiwe Expressway, Abuja
Nnamdi Azikiwe Expressway, Abuja is a major arterial highway in Nigeria’s capital city, running near key landmarks such as Aso Hill and connecting important districts across Abuja.
-
E.
Osogbo–Okuku road corridor
The Osogbo–Okuku road corridor is a major transportation route in Osun State, Nigeria, linking key towns and facilitating regional movement and commerce.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e58662081909ae346ab384514ca |
completed | April 16, 2026, 5:37 p.m. |
| NER | Named-entity recognition | batch_69f15f3196fc819098deffb0c7932ccc |
completed | April 29, 2026, 1:30 a.m. |
Created at: April 16, 2026, 8:51 p.m.