Triple

T22523770
Position Surface form Disambiguated ID Type / Status
Subject Virginia State Route 236 E556844 entity
Predicate abbreviation P43 FINISHED
Object VA 236 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: VA 236 | Statement: [Virginia State Route 236, abbreviation, VA 236]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: VA 236
Context triple: [Virginia State Route 236, abbreviation, VA 236]
  • A. VA 236 chosen
    VA 236 is a primary state highway in Northern Virginia that follows much of the historic Little River Turnpike corridor through Fairfax County and the City of Alexandria.
  • B. VA 234
    VA 234 is a primary state highway in Virginia that connects the Manassas area with Interstate 95 and other major routes in Northern Virginia.
  • C. VA 230
    VA 230 is a primary state highway in Virginia that connects U.S. Route 29 near Madison to U.S. Route 33 near Stanardsville, serving rural communities in Madison and Greene counties.
  • D. VA 243
    VA 243 is a short primary state highway in Fairfax County, Virginia, connecting Vienna to the surrounding road network near the Vienna/Fairfax–GMU Metro station.
  • E. VA 288
    VA 288 is a primary state highway in Virginia that serves as a partial beltway around the Richmond metropolitan area, connecting several major routes and suburbs.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e5657e881909f16ca58352c50da completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f15e34590c81909e4ed1c95f13a199 completed April 29, 2026, 1:26 a.m.
Created at: April 16, 2026, 8:50 p.m.