Triple

T22518657
Position Surface form Disambiguated ID Type / Status
Subject Lake Moultrie E556714 entity
Predicate createdBy P806 FINISHED
Object Santee Cooper Project NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Santee Cooper Project | Statement: [Lake Moultrie, createdBy, Santee Cooper Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Santee Cooper Project
Context triple: [Lake Moultrie, createdBy, Santee Cooper Project]
  • A. Santee Cooper hydropower project chosen
    The Santee Cooper hydropower project is a large New Deal–era public works development in South Carolina that created lakes and dams to generate hydroelectric power and support regional economic growth.
  • B. Yazoo Backwater Project
    The Yazoo Backwater Project is a long-debated U.S. Army Corps of Engineers flood-control initiative in Mississippi’s Yazoo River basin, best known for its controversial proposed pumping station and its environmental and political disputes.
  • C. Tellico Dam project
    The Tellico Dam project was a controversial Tennessee Valley Authority initiative on the Little Tennessee River, widely known for its environmental and cultural impacts, including the flooding of historic Cherokee sites and a landmark legal battle over the endangered snail darter.
  • D. Mokelumne River Project
    The Mokelumne River Project is a hydroelectric and water supply system on California’s Mokelumne River that includes dams, reservoirs, powerhouses, and associated facilities supporting regional water and energy needs.
  • E. Columbia Basin Project
    The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e5657e881909f16ca58352c50da completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f15e2f5c308190a0e6755a24340917 completed April 29, 2026, 1:26 a.m.
Created at: April 16, 2026, 8:50 p.m.