Triple

T22511415
Position Surface form Disambiguated ID Type / Status
Subject Ministry of Environment and Water of Bolivia E556527 entity
Predicate instanceOf P0 FINISHED
Object water resources ministry C19730 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: water resources ministry
Context triple: [Ministry of Environment and Water of Bolivia, instanceOf, water resources ministry]
  • A. water resources programme
    A water resources programme is an organized set of policies, projects, and management activities aimed at sustainably developing, allocating, protecting, and monitoring water resources to meet environmental, social, and economic needs.
  • B. water management agency chosen
    A water management agency is an organization responsible for planning, regulating, and overseeing the sustainable allocation, use, and protection of water resources within a defined region.
  • C. water management project
    A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
  • D. water management company
    A water management company is an organization that plans, operates, and maintains systems for sourcing, treating, distributing, conserving, and monitoring water resources for communities, industries, or agriculture.
  • E. water management structure
    A water management structure is a constructed facility or system designed to control, store, convey, or regulate the quantity and movement of water in natural or built environments.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e555edc81909ca803587dafd747 completed April 16, 2026, 5:37 p.m.
Created at: April 16, 2026, 8:50 p.m.