Triple

T22510148
Position Surface form Disambiguated ID Type / Status
Subject DoDIN transport infrastructure E556497 entity
Predicate instanceOf P0 FINISHED
Object communications infrastructure C3206 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: communications infrastructure
Context triple: [DoDIN transport infrastructure, instanceOf, communications infrastructure]
  • A. infrastructure chosen
    Infrastructure is the foundational physical and organizational systems—such as transportation, utilities, communication networks, and public facilities—that enable a society or organization to function and grow.
  • B. internet infrastructure component
    An internet infrastructure component is a foundational hardware or software element—such as routers, switches, servers, cables, or protocols—that enables the transmission, routing, and reliable delivery of data across interconnected networks.
  • C. telecommunications infrastructure component
    A telecommunications infrastructure component is a physical or virtual element—such as cables, antennas, switches, or routers—that enables the transmission, routing, and management of voice, data, and multimedia communications across networks.
  • D. telecommunications network
    A telecommunications network is a system of interconnected nodes, transmission media, and protocols that enables the exchange of voice, data, and multimedia information between users and devices over distance.
  • E. network technology
    Network technology encompasses the hardware, software, and protocols that enable devices and systems to connect, communicate, and exchange data over local and wide-area networks, including the internet.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e555edc81909ca803587dafd747 completed April 16, 2026, 5:37 p.m.
Created at: April 16, 2026, 8:50 p.m.