Triple
T22507708
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 光の教会 |
E556431
|
entity |
| Predicate | 竣工年 |
P85809
|
FINISHED |
| Object | 1989年 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1989年 | Statement: [光の教会, 竣工年, 1989年]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: 竣工年 Context triple: [光の教会, 竣工年, 1989年]
-
A.
workCompletionYear
chosen
Indicates the calendar year in which a particular work, project, or task was completed.
-
B.
majorDamCompletionYear
Indicates the calendar year in which a major dam was completed and became operational.
-
C.
revisionCompletionYear
Indicates the year in which a revision of something (e.g., a work, document, or item) was completed.
-
D.
designCompletionYear
Indicates the calendar year in which the design of something was completed.
-
E.
constructionResumptionYear
Indicates the year in which a previously halted or paused construction activity was resumed.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e555edc81909ca803587dafd747 |
completed | April 16, 2026, 5:37 p.m. |
| NER | Named-entity recognition | batch_69f15d5dec7c8190bf71ef76a2dfe9a4 |
completed | April 29, 2026, 1:22 a.m. |
| PD | Predicate disambiguation | batch_69e898be31448190be5ae7f5656f0497 |
completed | April 22, 2026, 9:45 a.m. |
Created at: April 16, 2026, 8:50 p.m.