Triple

T2248124
Position Surface form Disambiguated ID Type / Status
Subject Air Route Traffic Control Center E49552 entity
Predicate transitionTo P36477 FINISHED
Object Terminal Radar Approach Control E248073 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Terminal Radar Approach Control | Statement: [Air Route Traffic Control Center, transitionTo, Terminal Radar Approach Control]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Terminal Radar Approach Control
Context triple: [Air Route Traffic Control Center, transitionTo, Terminal Radar Approach Control]
  • A. Terminal Radar Approach Control chosen
    Terminal Radar Approach Control (TRACON) is an air traffic control facility responsible for managing and sequencing aircraft during the approach, departure, and transition phases within the airspace surrounding major airports using radar.
  • B. Air Traffic Control Centre
    The Air Traffic Control Centre is a Belgian Air Force unit responsible for managing and coordinating military air traffic within Belgian airspace.
  • C. Air Route Traffic Control Centers
    Air Route Traffic Control Centers are FAA-operated facilities that provide en route air traffic control services for aircraft flying through high-altitude sectors of U.S. airspace between departure and arrival terminal areas.
  • D. Air Traffic Control Tower
    An Air Traffic Control Tower is a facility at an airport from which controllers manage aircraft movements on the ground and in the immediate airspace around the airport.
  • E. Air Traffic Organization
    The Air Traffic Organization is the operational arm of the U.S. Federal Aviation Administration responsible for managing and controlling the nation’s air traffic system.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: transitionTo
Context triple: [Air Route Traffic Control Center, transitionTo, Terminal Radar Approach Control]
  • A. transition
    Indicates a change of state or condition from one form, phase, or situation to another.
  • B. transitionProgram
    Indicates a relationship where one entity serves as a program or structured process that facilitates another entity’s transition from one state, phase, or condition to another.
  • C. transitionedInto
    Indicates that one entity changed state, form, role, or condition to become another specified state or entity.
  • D. transitionMechanismUsedWith
    Indicates that a particular transition or change from one state to another is carried out using a specified mechanism or method.
  • E. navigableTo
    Indicates that one entity can be reached or traversed to from another entity, typically following valid paths or connections within a system or environment.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88aa979788190ad6500f1d8eee2fc completed March 4, 2026, 7:40 p.m.
NER Named-entity recognition batch_69abc0ed5c38819080b45ea398fb59f2 completed March 7, 2026, 6:08 a.m.
NED1 Entity disambiguation (via context triple) batch_69ae71c1edd081909acbb8b1915ce0d6 completed March 9, 2026, 7:07 a.m.
PD Predicate disambiguation batch_69abbdb160248190aa75b38f11ad8602 completed March 7, 2026, 5:54 a.m.
PDg Predicate description generation batch_69abbe4252688190944491a450383450 completed March 7, 2026, 5:57 a.m.
Created at: March 4, 2026, 7:47 p.m.