Triple
T22478217
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | U.S. Route 199 |
E555689
|
entity |
| Predicate | designation |
P38
|
FINISHED |
| Object | US 199 |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: US 199 | Statement: [U.S. Route 199, designation, US 199]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: US 199 Context triple: [U.S. Route 199, designation, US 199]
-
A.
US 19
US 19 is a major north–south United States highway running from Florida to Pennsylvania, serving numerous cities and regions along the eastern part of the country.
-
B.
US 99
US 99 was a major former north–south U.S. highway that ran along the West Coast, primarily through California, and served as a key predecessor to parts of today’s Interstate 5.
-
C.
US 9
US 9 is a major north–south U.S. Highway running along the East Coast, primarily through New Jersey and New York, connecting urban, suburban, and coastal communities.
-
D.
US 59
US 59 is a major north–south U.S. Highway running from the Mexico–United States border in Texas through several states to the Canadian border in Minnesota.
-
E.
U.S. Route 199
chosen
U.S. Route 199 is a U.S. highway in northern California and southern Oregon that connects U.S. Route 101 near Crescent City to Interstate 5 near Grants Pass, serving as a key route through the rugged interior.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e52c2048190952dc5df209b9bed |
completed | April 16, 2026, 5:37 p.m. |
| NER | Named-entity recognition | batch_69f15be58ed08190b88706a7cb85616b |
completed | April 29, 2026, 1:16 a.m. |
Created at: April 16, 2026, 8:49 p.m.