Triple

T22475404
Position Surface form Disambiguated ID Type / Status
Subject ISO/IEC JTC 1/SC 2/WG 3 E555615 entity
Predicate instanceOf P0 FINISHED
Object ISO/IEC working group C18859 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ISO/IEC working group
Context triple: [ISO/IEC JTC 1/SC 2/WG 3, instanceOf, ISO/IEC working group]
  • A. ISO/IEC subcommittee chosen
    An ISO/IEC subcommittee is a specialized working group within the joint International Organization for Standardization and International Electrotechnical Commission structure that develops, maintains, and oversees standards in a specific technical or thematic area.
  • B. IETF working group
    An IETF working group is a collaborative, time-bounded team of experts chartered within the Internet Engineering Task Force to develop, discuss, and standardize specific Internet technologies or protocols.
  • C. ISO/IEC standard
    An ISO/IEC standard is a formally agreed-upon specification developed jointly by the International Organization for Standardization (ISO) and the International Electrotechnical Commission (IEC) that defines common requirements, guidelines, or characteristics for products, services, or systems to ensure quality, safety, interoperability, and consistency across international markets.
  • D. organ of the International Organization for Standardization
    An organ of the International Organization for Standardization is a formal structural body within ISO, such as a council, committee, or technical group, that is responsible for specific governance, coordination, or standardization functions.
  • E. collaborative working group
    A collaborative working group is a coordinated team of individuals who share responsibilities, knowledge, and decision-making to achieve a common goal or complete a specific project.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e52c2048190952dc5df209b9bed completed April 16, 2026, 5:37 p.m.
Created at: April 16, 2026, 8:49 p.m.