Triple

T22460250
Position Surface form Disambiguated ID Type / Status
Subject National Parks Board of Singapore E555209 entity
Predicate hasProgramme P6928 FINISHED
Object Park Connector Network NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Park Connector Network | Statement: [National Parks Board of Singapore, hasProgramme, Park Connector Network]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Park Connector Network
Context triple: [National Parks Board of Singapore, hasProgramme, Park Connector Network]
  • A. Southwest Corridor Park
    Southwest Corridor Park is a linear urban greenway in Boston that combines parks, playgrounds, and bike paths along a former rail corridor connecting several neighborhoods.
  • B. LaSalle Trail system
    The LaSalle Trail system is a network of recreational multi-use trails in the Town of LaSalle, Ontario, used for walking, cycling, and outdoor leisure.
  • C. Medina River Greenway
    Medina River Greenway is a scenic multi-use trail and natural corridor along the Medina River in San Antonio, offering hiking, biking, and wildlife viewing in a preserved riparian landscape.
  • D. Fanno Creek Greenway
    Fanno Creek Greenway is a popular multi-use trail and natural corridor in the Portland, Oregon metropolitan area, offering recreational paths, wildlife habitat, and green space along Fanno Creek.
  • E. East Lake Greenway
    East Lake Greenway is a scenic recreational trail and park system encircling Wuhan’s East Lake, popular for walking, cycling, and enjoying lakeside views and greenery.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Park Connector Network
Target entity description: The Park Connector Network is a nationwide system of green corridors and recreational paths in Singapore that links parks, nature reserves, and residential areas to promote outdoor activities and ecological connectivity.
  • A. Southwest Corridor Park
    Southwest Corridor Park is a linear urban greenway in Boston that combines parks, playgrounds, and bike paths along a former rail corridor connecting several neighborhoods.
  • B. LaSalle Trail system
    The LaSalle Trail system is a network of recreational multi-use trails in the Town of LaSalle, Ontario, used for walking, cycling, and outdoor leisure.
  • C. Medina River Greenway
    Medina River Greenway is a scenic multi-use trail and natural corridor along the Medina River in San Antonio, offering hiking, biking, and wildlife viewing in a preserved riparian landscape.
  • D. Fanno Creek Greenway
    Fanno Creek Greenway is a popular multi-use trail and natural corridor in the Portland, Oregon metropolitan area, offering recreational paths, wildlife habitat, and green space along Fanno Creek.
  • E. East Lake Greenway
    East Lake Greenway is a scenic recreational trail and park system encircling Wuhan’s East Lake, popular for walking, cycling, and enjoying lakeside views and greenery.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e51fdec8190adfdf9f8a6362221 completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f15b7eb5688190bd5e41d4d8189668 completed April 29, 2026, 1:14 a.m.
Created at: April 16, 2026, 8:48 p.m.