Triple
T22440455
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 乾門 |
E554740
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | 施設 |
C19689
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: 施設 Context triple: [乾門, instanceOf, 施設]
-
A.
facility
chosen
A facility is a physical place or infrastructure designed and equipped to support specific activities, services, or operations.
-
B.
tourist facility
A tourist facility is a place or establishment that provides services, amenities, or attractions specifically designed to accommodate and enhance the experience of visitors and travelers.
-
C.
infrastructure facility
An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
-
D.
entrance facility
An entrance facility is the physical location where external telecommunications services and cabling enter a building or campus and interface with the internal network infrastructure.
-
E.
building
A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e5010e48190ae1e9c9db9697637 |
completed | April 16, 2026, 5:37 p.m. |
Created at: April 16, 2026, 8:47 p.m.