Triple
T22420117
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Southwest Calgary |
E554223
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | city quadrant |
C46256
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: city quadrant Context triple: [Southwest Calgary, instanceOf, city quadrant]
-
A.
port city quarter
A port city quarter is an urban district located along a harbor or waterfront that concentrates maritime infrastructure, trade activities, and related residential and commercial development.
-
B.
metropolitan district
A metropolitan district is an administrative or governmental region that encompasses a central city and its surrounding urban and suburban areas, managed as a single integrated unit for planning, services, and governance.
-
C.
museum quarter
A museum quarter is an urban district where multiple museums and cultural institutions are clustered together, often integrated with public spaces, galleries, and amenities to create a concentrated cultural hub.
-
D.
quarter of Paris
A quarter of Paris is a distinct urban district within the city, characterized by its own historical background, architectural style, local culture, and community life.
-
E.
residential quadrangle
A residential quadrangle is a four-sided courtyard or open space enclosed or bordered by housing buildings, typically used for communal living, circulation, and social interaction.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e4f2d0c819091aa3558ea2ee630 |
completed | April 16, 2026, 5:37 p.m. |
Created at: April 16, 2026, 8:46 p.m.