Triple

T22411897
Position Surface form Disambiguated ID Type / Status
Subject Peel station E554011 entity
Predicate partOfNetworkOpeningPhase P94215 FINISHED
Object original Montreal Metro network LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: original Montreal Metro network | Statement: [Peel station, partOfNetworkOpeningPhase, original Montreal Metro network]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: partOfNetworkOpeningPhase
Context triple: [Peel station, partOfNetworkOpeningPhase, original Montreal Metro network]
  • A. phasedOpening chosen
    Indicates that the opening or launch of something occurs in multiple planned stages or phases rather than all at once.
  • B. modernNetworkOpening
    Indicates that an entity initiates or participates in a contemporary, innovative approach to starting or establishing a network or networked interaction.
  • C. lineOpeningPhase
    Indicates the phase or stage during which a line (such as a service, process, or system) is initially opened or brought into operation.
  • D. modernPhaseBegins
    Indicates that a transition occurs marking the start of a modern phase or period in a process, development, or timeline.
  • E. phase1OpeningDate
    Indicates the date on which the first phase of a project, development, or initiative is officially opened or begins operation.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e4e6ce8819085a1e06d886bf21c completed April 16, 2026, 5:37 p.m.
NER Named-entity recognition batch_69f15943dd84819099e77563da470594 completed April 29, 2026, 1:05 a.m.
PD Predicate disambiguation batch_69e8989495bc81909d2699fce5992e28 completed April 22, 2026, 9:44 a.m.
Created at: April 16, 2026, 8:46 p.m.