Triple

T22388728
Position Surface form Disambiguated ID Type / Status
Subject Southeast Ridge route on Mount Everest E553461 entity
Predicate instanceOf P0 FINISHED
Object Everest normal route C27175 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Everest normal route
Context triple: [Southeast Ridge route on Mount Everest, instanceOf, Everest normal route]
  • A. Mount Fuji climbing route
    A Mount Fuji climbing route is a designated path with associated facilities and waypoints that guides climbers safely from the mountain’s base to its summit.
  • B. standard ascent route chosen
    A standard ascent route is the most commonly used and generally accepted path taken to climb a particular mountain or peak, typically chosen for its balance of safety, accessibility, and efficiency.
  • C. north face route
    A north face route is a climbing or mountaineering line that ascends the generally colder, steeper, and more challenging northern aspect of a mountain.
  • D. mountaineering expedition
    A mountaineering expedition is an organized journey by a team to plan, approach, and ascend challenging mountain terrain, managing technical, environmental, and logistical risks to reach specific climbing objectives.
  • E. mountaineering route collection
    A mountaineering route collection is an organized set of documented climbing routes, typically grouped by region, mountain, or difficulty, used for planning, reference, and comparison by climbers and expedition planners.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e4cf87c8190a1ff474daec326b7 completed April 16, 2026, 5:37 p.m.
Created at: April 16, 2026, 8:45 p.m.