Triple

T2238578
Position Surface form Disambiguated ID Type / Status
Subject STS-125 E49339 entity
Predicate contingencyPlan P29774 FINISHED
Object launch-on-need rescue mission STS-400
Launch-on-need rescue mission STS-400 was a planned but never flown Space Shuttle contingency mission intended to rescue the crew of STS-125 in the event their orbiter was damaged and could not safely return to Earth.
E247703 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: launch-on-need rescue mission STS-400 | Statement: [STS-125, contingencyPlan, launch-on-need rescue mission STS-400]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: launch-on-need rescue mission STS-400
Context triple: [STS-125, contingencyPlan, launch-on-need rescue mission STS-400]
  • A. STS-41-D
    STS-41-D was the maiden orbital mission of the Space Shuttle Discovery, launched by NASA in 1984 to deploy communications satellites and conduct scientific experiments.
  • B. STS-41-G
    STS-41-G was a 1984 NASA Space Shuttle Challenger mission notable for carrying multiple payload specialists and advancing Earth observation and satellite deployment capabilities.
  • C. STS-114
    STS-114 was NASA’s 2005 Space Shuttle Discovery “Return to Flight” mission that marked the resumption of shuttle operations after the Columbia disaster, focusing on testing new safety procedures and resupplying the International Space Station.
  • D. STS-44
    STS-44 was a 1991 NASA Space Shuttle Atlantis mission dedicated primarily to deploying a Defense Support Program (DSP) early-warning satellite for the U.S. Department of Defense.
  • E. STS-41C
    STS-41C was a 1984 NASA Space Shuttle Challenger mission notable for successfully repairing the Solar Maximum Mission satellite during the first on-orbit satellite repair operation.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: launch-on-need rescue mission STS-400
Triple: [STS-125, contingencyPlan, launch-on-need rescue mission STS-400]
Generated description
Launch-on-need rescue mission STS-400 was a planned but never flown Space Shuttle contingency mission intended to rescue the crew of STS-125 in the event their orbiter was damaged and could not safely return to Earth.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: launch-on-need rescue mission STS-400
Target entity description: Launch-on-need rescue mission STS-400 was a planned but never flown Space Shuttle contingency mission intended to rescue the crew of STS-125 in the event their orbiter was damaged and could not safely return to Earth.
  • A. STS-41-D
    STS-41-D was the maiden orbital mission of the Space Shuttle Discovery, launched by NASA in 1984 to deploy communications satellites and conduct scientific experiments.
  • B. STS-41-G
    STS-41-G was a 1984 NASA Space Shuttle Challenger mission notable for carrying multiple payload specialists and advancing Earth observation and satellite deployment capabilities.
  • C. STS-114
    STS-114 was NASA’s 2005 Space Shuttle Discovery “Return to Flight” mission that marked the resumption of shuttle operations after the Columbia disaster, focusing on testing new safety procedures and resupplying the International Space Station.
  • D. STS-44
    STS-44 was a 1991 NASA Space Shuttle Atlantis mission dedicated primarily to deploying a Defense Support Program (DSP) early-warning satellite for the U.S. Department of Defense.
  • E. STS-41C
    STS-41C was a 1984 NASA Space Shuttle Challenger mission notable for successfully repairing the Solar Maximum Mission satellite during the first on-orbit satellite repair operation.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: contingencyPlan
Context triple: [STS-125, contingencyPlan, launch-on-need rescue mission STS-400]
  • A. compromisePlan
    Indicates that an entity develops, proposes, or adopts a plan intended to reconcile conflicting positions or interests between parties.
  • B. partOfPlan chosen
    Indicates that one entity is included as a component or step within a broader plan or strategy.
  • C. planned
    Indicates that an entity has intentionally arranged or scheduled another entity or event to occur in the future.
  • D. plan
    Indicates that an entity intends or arranges for a future action or sequence of actions to occur.
  • E. plannedUnder
    Indicates that one entity has been scheduled, organized, or arranged to occur within the scope, authority, or framework of another entity.
  • F. None of above.

Provenance (6 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88aa84bdc819086df50e9c20b301e completed March 4, 2026, 7:40 p.m.
NER Named-entity recognition batch_69abc096c7748190a545cc9b229bde62 completed March 7, 2026, 6:07 a.m.
NED1 Entity disambiguation (via context triple) batch_69ae6b0a9ee881909dee8b0a657b9c73 completed March 9, 2026, 6:39 a.m.
NEDg Description generation batch_69ae6bbccdb08190a73fd20a110219d9 completed March 9, 2026, 6:42 a.m.
NED2 Entity disambiguation (via description) batch_69ae6c3d07a08190a6221a33fd02f73e completed March 9, 2026, 6:44 a.m.
PD Predicate disambiguation batch_69abbdafc07881909101266a33ae7031 completed March 7, 2026, 5:54 a.m.
Created at: March 4, 2026, 7:47 p.m.