Triple
T2238550
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | STS-125 |
E49339
|
entity |
| Predicate | followedBy |
P78
|
FINISHED |
| Object |
STS-127
STS-127 was a 2009 NASA Space Shuttle Endeavour mission to the International Space Station that delivered and assembled key components of Japan’s Kibo laboratory.
|
E251477
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-127 | Statement: [STS-125, followedBy, STS-127]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: STS-127 Context triple: [STS-125, followedBy, STS-127]
-
A.
STS-124
STS-124 was a NASA Space Shuttle Discovery mission to the International Space Station in 2008 that delivered and installed Japan’s Kibo laboratory module.
-
B.
STS-121
STS-121 was a 2006 NASA Space Shuttle Discovery mission focused on testing new safety improvements and resupply of the International Space Station as part of the post-Columbia "Return to Flight" efforts.
-
C.
STS-120
STS-120 was a 2007 Space Shuttle mission to the International Space Station that delivered the Harmony (Node 2) module and featured a dramatic solar array repair spacewalk.
-
D.
STS-115
STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
-
E.
STS-134
STS-134 was the penultimate mission of NASA’s Space Shuttle program, a 2011 flight of Endeavour to the International Space Station that delivered the Alpha Magnetic Spectrometer and other critical hardware.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: STS-127 Triple: [STS-125, followedBy, STS-127]
Generated description
STS-127 was a 2009 NASA Space Shuttle Endeavour mission to the International Space Station that delivered and assembled key components of Japan’s Kibo laboratory.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: STS-127 Target entity description: STS-127 was a 2009 NASA Space Shuttle Endeavour mission to the International Space Station that delivered and assembled key components of Japan’s Kibo laboratory.
-
A.
STS-124
STS-124 was a NASA Space Shuttle Discovery mission to the International Space Station in 2008 that delivered and installed Japan’s Kibo laboratory module.
-
B.
STS-121
STS-121 was a 2006 NASA Space Shuttle Discovery mission focused on testing new safety improvements and resupply of the International Space Station as part of the post-Columbia "Return to Flight" efforts.
-
C.
STS-120
STS-120 was a 2007 Space Shuttle mission to the International Space Station that delivered the Harmony (Node 2) module and featured a dramatic solar array repair spacewalk.
-
D.
STS-115
STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
-
E.
STS-134
STS-134 was the penultimate mission of NASA’s Space Shuttle program, a 2011 flight of Endeavour to the International Space Station that delivered the Alpha Magnetic Spectrometer and other critical hardware.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88aa84bdc819086df50e9c20b301e |
completed | March 4, 2026, 7:40 p.m. |
| NER | Named-entity recognition | batch_69abc096c7748190a545cc9b229bde62 |
completed | March 7, 2026, 6:07 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ae71bd294c8190b46fc4ad69cb7c37 |
completed | March 9, 2026, 7:07 a.m. |
| NEDg | Description generation | batch_69ae728e46608190b4192519c705bc32 |
completed | March 9, 2026, 7:11 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69ae72ff572081909b7c4aebb9e26180 |
completed | March 9, 2026, 7:13 a.m. |
Created at: March 4, 2026, 7:47 p.m.