Triple
T22383229
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Old Waterworks (Altes Wasserwerk) |
E553326
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former waterworks |
C46211
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former waterworks Context triple: [Old Waterworks (Altes Wasserwerk), instanceOf, former waterworks]
-
A.
former waterfall
A former waterfall is a geological feature where a waterfall once existed but has since disappeared due to processes like erosion, river course changes, or human intervention, leaving behind characteristic landforms such as dry falls, plunge pools, or abandoned channels.
-
B.
former canal
A former canal is a disused or decommissioned artificial waterway that once facilitated transportation, irrigation, or drainage but no longer serves its original function.
-
C.
former riverbed
A former riverbed is the abandoned channel or course where a river once flowed, now typically filled with sediments, vegetation, or repurposed landforms.
-
D.
historic water feature
A historic water feature is a man-made or modified natural water element, such as a fountain, canal, pond, or well, that holds cultural, architectural, or historical significance within a landscape or built environment.
-
E.
former pier
A former pier is a structure that once extended from the shore into a body of water for docking, loading, or recreation, but is no longer used or maintained for its original purpose.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e4cf87c8190a1ff474daec326b7 |
completed | April 16, 2026, 5:37 p.m. |
Created at: April 16, 2026, 8:45 p.m.