Triple

T22375851
Position Surface form Disambiguated ID Type / Status
Subject Firefox DevTools E553149 entity
Predicate instanceOf P0 FINISHED
Object Web development tool suite C15486 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Web development tool suite
Context triple: [Firefox DevTools, instanceOf, Web development tool suite]
  • A. Web technology suite
    A web technology suite is an integrated collection of tools, frameworks, and protocols used to design, develop, deploy, and manage web applications and services.
  • B. developer tool chosen
    A developer tool is a software application or utility designed to help programmers create, test, debug, and maintain code more efficiently.
  • C. collection of programming tools
    A collection of programming tools is an organized set of software utilities, libraries, and environments designed to assist developers in writing, testing, debugging, and maintaining code efficiently.
  • D. software development system
    A software development system is an integrated environment of tools, processes, and infrastructure that supports the planning, creation, testing, deployment, and maintenance of software applications.
  • E. cross-platform development framework
    A cross-platform development framework is a software toolkit that enables developers to build applications that run on multiple operating systems or devices from a single shared codebase.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e4c03248190a26a5060ea6973ee completed April 16, 2026, 5:37 p.m.
Created at: April 16, 2026, 8:45 p.m.