Triple
T22369860
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Akure South Local Government Area |
E553009
|
entity |
| Predicate | hasRoadLink |
P11435
|
FINISHED |
| Object | Akure–Ado Ekiti Road |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Akure–Ado Ekiti Road | Statement: [Akure South Local Government Area, hasRoadLink, Akure–Ado Ekiti Road]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Akure–Ado Ekiti Road Context triple: [Akure South Local Government Area, hasRoadLink, Akure–Ado Ekiti Road]
-
A.
Osogbo–Okuku road corridor
The Osogbo–Okuku road corridor is a major transportation route in Osun State, Nigeria, linking key towns and facilitating regional movement and commerce.
-
B.
Ibadan–Ife expressway
The Ibadan–Ife expressway is a major highway in southwestern Nigeria that connects the cities of Ibadan and Ile-Ife, facilitating regional travel and commerce.
-
C.
Lagos–Abeokuta Expressway
The Lagos–Abeokuta Expressway is a major highway in southwestern Nigeria that connects the city of Lagos with Abeokuta, facilitating significant commuter and commercial traffic between the two urban centers.
-
D.
Warri–Benin City Highway
The Warri–Benin City Highway is a major roadway in southern Nigeria that connects the oil-rich city of Warri with the historic city of Benin, serving as a key route for regional transport and commerce.
-
E.
Kaduna–Zaria highway
The Kaduna–Zaria highway is a major intercity roadway in northern Nigeria that serves as a key transport corridor between the cities of Kaduna and Zaria.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Akure–Ado Ekiti Road Target entity description: The Akure–Ado Ekiti Road is a major intercity highway in southwestern Nigeria that connects Akure in Ondo State with Ado Ekiti in Ekiti State, serving as a key route for regional travel and commerce.
-
A.
Osogbo–Okuku road corridor
The Osogbo–Okuku road corridor is a major transportation route in Osun State, Nigeria, linking key towns and facilitating regional movement and commerce.
-
B.
Ibadan–Ife expressway
The Ibadan–Ife expressway is a major highway in southwestern Nigeria that connects the cities of Ibadan and Ile-Ife, facilitating regional travel and commerce.
-
C.
Lagos–Abeokuta Expressway
The Lagos–Abeokuta Expressway is a major highway in southwestern Nigeria that connects the city of Lagos with Abeokuta, facilitating significant commuter and commercial traffic between the two urban centers.
-
D.
Warri–Benin City Highway
The Warri–Benin City Highway is a major roadway in southern Nigeria that connects the oil-rich city of Warri with the historic city of Benin, serving as a key route for regional transport and commerce.
-
E.
Kaduna–Zaria highway
The Kaduna–Zaria highway is a major intercity roadway in northern Nigeria that serves as a key transport corridor between the cities of Kaduna and Zaria.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e4affcc8190ba7c27d29062558d |
completed | April 16, 2026, 5:37 p.m. |
| NER | Named-entity recognition | batch_69f158032b748190ad36c7e3809304e9 |
completed | April 29, 2026, 12:59 a.m. |
Created at: April 16, 2026, 8:44 p.m.