Triple

T22358467
Position Surface form Disambiguated ID Type / Status
Subject Halkalı–Gebze commuter rail line E552717 entity
Predicate instanceOf P0 FINISHED
Object railway line in Turkey C3787 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway line in Turkey
Context triple: [Halkalı–Gebze commuter rail line, instanceOf, railway line in Turkey]
  • A. railway line chosen
    A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
  • B. road in Turkey
    A road in Turkey is a transportation route within the country’s diverse network of highways, regional roads, and local streets that connects cities, towns, and rural areas across varied terrains and climates.
  • C. railroad line
    A railroad line is a fixed route consisting of tracks and associated infrastructure over which trains operate to transport passengers or freight between locations.
  • D. railway line in Portugal
    A railway line in Portugal is a defined rail corridor within the Portuguese rail network, consisting of tracks, infrastructure, and associated facilities that support train operations between specified locations.
  • E. railway line in the Philippines
    A railway line in the Philippines is a fixed transportation corridor consisting of tracks, stations, and related infrastructure used for the operation of passenger and/or freight trains within the Philippine archipelago.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e11e4a0ad08190a385b4d343cf6524 completed April 16, 2026, 5:37 p.m.
Created at: April 16, 2026, 8:44 p.m.