Triple
T22353646
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Split Lake, Manitoba |
E552595
|
entity |
| Predicate | nearbyHydroelectricProject |
P144900
|
FINISHED |
| Object | Keeyask Generating Station |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Keeyask Generating Station | Statement: [Split Lake, Manitoba, nearbyHydroelectricProject, Keeyask Generating Station]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Keeyask Generating Station Context triple: [Split Lake, Manitoba, nearbyHydroelectricProject, Keeyask Generating Station]
-
A.
Kettle Rapids Generating Station
Kettle Rapids Generating Station is a hydroelectric power plant located on the Mattagami River in Ontario, Canada, that generates electricity from the river’s flow.
-
B.
Smoky Falls Generating Station
Smoky Falls Generating Station is a hydroelectric power plant in northern Ontario, Canada, that harnesses the flow of the Mattagami River to generate electricity.
-
C.
Barrett Chute Generating Station
Barrett Chute Generating Station is a hydroelectric power facility located on the Madawaska River in Ontario, Canada.
-
D.
Muskrat Falls Generating Station
Muskrat Falls Generating Station is a large hydroelectric power facility on the lower Churchill River in Labrador, Canada, developed to supply renewable electricity to Newfoundland and Labrador and beyond.
-
E.
Rapide-Blanc Generating Station
Rapide-Blanc Generating Station is a hydroelectric power plant in Quebec, Canada, that harnesses the flow of the Saint-Maurice River to generate electricity.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Keeyask Generating Station Target entity description: Keeyask Generating Station is a large hydroelectric power facility on the Nelson River in northern Manitoba, Canada, developed to provide renewable electricity as part of the province’s expanding hydro system.
-
A.
Kettle Rapids Generating Station
Kettle Rapids Generating Station is a hydroelectric power plant located on the Mattagami River in Ontario, Canada, that generates electricity from the river’s flow.
-
B.
Smoky Falls Generating Station
Smoky Falls Generating Station is a hydroelectric power plant in northern Ontario, Canada, that harnesses the flow of the Mattagami River to generate electricity.
-
C.
Barrett Chute Generating Station
Barrett Chute Generating Station is a hydroelectric power facility located on the Madawaska River in Ontario, Canada.
-
D.
Muskrat Falls Generating Station
Muskrat Falls Generating Station is a large hydroelectric power facility on the lower Churchill River in Labrador, Canada, developed to supply renewable electricity to Newfoundland and Labrador and beyond.
-
E.
Rapide-Blanc Generating Station
Rapide-Blanc Generating Station is a hydroelectric power plant in Quebec, Canada, that harnesses the flow of the Saint-Maurice River to generate electricity.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e11e4a0ad08190a385b4d343cf6524 |
completed | April 16, 2026, 5:37 p.m. |
| NER | Named-entity recognition | batch_69f157cd934c8190b9d60805e24ae6a6 |
completed | April 29, 2026, 12:58 a.m. |
Created at: April 16, 2026, 8:44 p.m.